WELL · 42-493-32447 · DISTRICT 1
GW-A. Scull #2
Wilson County · LA Vernia field · Vertical
GW-A. Scull #2 (API 42-493-32447) is a plugged well in Wilson County, plugged August 15, 2008, last operated by Metco Oil Corporation.
The RRC has issued 2 drilling permits between 1996 and 1997, permitted to 1,000 ft.
Completion filings report one formation top, including Poth.
Its 2 leases have reported 21.7K barrels of oil since December 1996, last reporting in July 2026. The leases carry 6 wells, so these are lease totals, not this well alone.
Operator of record
Seguin, TX · P-5 Y, filed Jul 8, 2016 · 55 permits on file · (830) 305-5442
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Metco Oil Corporation |
| Production reports | ENERGON3through Aug 2017 |
| Latest permit | Metco Oil CorporationJul 15, 1997 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,000
- total depth, ft
- 2
- permits on file
- Jul 15, 1997
- last permit issued
- Dec 10, 1996
- completed
- 21.7K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 1996 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 10, 1996
- Shut in
- —
- Plugged
- Aug 15, 2008
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 6 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| GW-Scull, A. O-1-14119 | Glenn Poth (Poth Sand) | Elam Oil Company LLC | 4 | 20K | 0 | Dec 1996 – Jul 2026 |
| GW-A. Scull O-1-14083 | LA Vernia | Metco Oil Corporation | 2 | 1.75K | 0 | Dec 1996 – Nov 1997 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Metco Oil CorporationDec 1996 → Oct 2015
- 2ENERGON3Apr 2016 → Aug 2017
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 464661-99 | Field transfer | Metco Oil Corporation | Jul 8, 1997 | Jul 15, 1997 | Sep 30, 1996 | 1,000 |
| 452509-99 | Drill | Metco Oil Corporation | Sep 11, 1996 | Sep 24, 1996 | Oct 1, 1996 | 1,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-14083 | — | — | — | — |
| — | — O-1-14119 | — | — | — | — |
| — | — O-1-14119 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 958 | 962 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 4.5 | 1,014 | 6.75 | 120 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 27, 1997 | Jul 21, 1997 | — |
| 00 | Sep 5, 1997 | — | Yes |
| 00 | Aug 18, 1997 | — | — |
| 00 | May 13, 1997 | Apr 28, 1997 | — |
| 00 | Jan 23, 1997 | Jan 7, 1997 | Yes |
| 00 | Jan 16, 1997 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-493-32447 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-493-32447 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/49332447, documented in the API reference.