WELL · 42-493-32726 · DISTRICT 1
Johnson #2H
Wilson County · Marcelina Creek (Buda) field · Horizontal
Johnson #2H (API 42-493-32726) is a horizontal well in Wilson County operated by Bayshore Operating Corp. L.L.C., completed July 29, 2013.
The RRC has issued 3 drilling permits between 2013 and 2025, permitted to 8,900 ft.
It was permitted by Hominy Consulting, LLC and has since transferred to Bayshore Operating Corp. L.L.C. on the wellbore schedule.
Completion filings report 11 formation tops, including Taylor, Olmos, Serpentine, Austin Chalk.
Its 2 leases have reported 179K barrels of oil and 30.5K mcf of gas since June 1999, last reporting in July 2026. The leases carry 6 wells, so these are lease totals, not this well alone.
Operator of record
Bayshore Operating Corp. L.L.C.
Permitted by Hominy Consulting, LLC; the EWA schedule now lists a different operator.
Corpus Christ, TX · P-5 Y, filed Jun 4, 2026 · 13 permits on file · (361) 776-3634
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Bayshore Operating Corp. L.L.C. |
| Production reports | Hominy Consulting, LLCthrough Apr 2026 |
| Latest permit | Hominy Consulting, LLCFeb 21, 2025 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,900
- total depth, ft
- 3
- permits on file
- Feb 21, 2025
- last permit issued
- Jul 29, 2013
- completed
- 179K
- cumulative oil, bbl
- 30.5K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 1999 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 29, 2013
- Shut in
- —
- Plugged
- —
Surface location
29.023609, -98.086710
OpenStreetMap → · Google Maps →
Permit surface location from the RRC GIS record, in Wilson County.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 6 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Johnson O-1-18780 | Marcelina Creek (Austin Chalk) | Hominy Consulting, LLC | 3 | 75.3K | 0 | Feb 2016 – Jul 2026 |
| Johnson O-1-14258 | Marcelina Creek (Buda) | Bayshore Operating Corp., L.L.C. | 3 | 104K | 30.5K | Jun 1999 – Feb 2018 |
Oil, barrels lease total
Last 12 months 45,156 · prior 12 7,033(+542%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Pedeco, Inc.Jun 1999 → May 2002
- 2Spur Operating Co.Aug 2002 → Apr 2005
- 3Bayshore Operating Co.May 2005 → Mar 2009
- 4Bayshore Operating Corp., L.L.C.Apr 2009 → Apr 2021
- 5Reo Operating LLCMay 2021 → Aug 2024
- 6Hominy Consulting, LLCSep 2024 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 905950-99 | Recompletion | Hominy Consulting, LLC | Feb 14, 2025 | Feb 21, 2025 | — | 8,340 |
| 829705-99 | Recompletion | Bayshore Operating Corp., L.L.C. | Aug 9, 2017 | Aug 11, 2017 | Aug 4, 2017 | 8,340 |
| 763184-99 | Drill | Bayshore Operating Corp., L.L.C. | May 22, 2013 | May 24, 2013 | May 27, 2013 | 8,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-14258 | — | — | — | — |
| — | — O-1-18780 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 404 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Taylor | 6,790 | -6,386 |
| Olmos | 7,280 | -6,876 |
| Serpentine | 7,669 | -7,265 |
| Austin Chalk | 7,670 | -7,266 |
| Austin ChalkAUSTIN CHALK - H2S | 7,670 | -7,266 |
| Austin Chalk | 8,060 | -7,656 |
| Eagle Ford | 8,223 | -7,819 |
| Eagle FordEAGLE FORD - H2S | 8,223 | -7,819 |
| Buda | 8,280 | -7,876 |
| BudaBUDA - H2S | 8,280 | -7,876 |
| AnacachoANACACHO - H2S | — | — |
| Buda | — | — |
| Eagle Ford | — | — |
| EdwardsEDWARDS - H2S, DISPOSAL | — | — |
| GeorgetownGEORGETOWN - H2S | — | — |
| Navarro | — | — |
| Olmos | — | — |
| WilcoxWILCOX - DISPOSAL | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,104 | 8,159 | Perforated |
| 8,450 | 10,432 | Perforated |
| 8,480 | 10,460 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 5,235 | 14.75 | 2,450 S |
| 7.625 | 8,480 | 9.875 | 730 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 18, 2026 | Jul 31, 2025 | — |
| 00 | Feb 13, 2018 | Sep 14, 2017 | — |
| 00 | Dec 9, 2014 | Aug 31, 2013 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-493-32726 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-493-32726 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Nearby wells and their tops
NEAREST 8 LOCATED WELLS WITH TOPS · WITHIN 16 KM
Draw a cross-section
This well's tops beside its 5 nearest neighbours, subsea-aligned so they line up regardless of surface terrain.
Johnson42-493-32554
0.7 KM · Hominy Consulting, LLC · Section with this well →
| Wilcox | 3,210 | -2,812 |
| Midway | 5,050 | -4,652 |
| Navarro | 6,180 | -5,782 |
| Taylor | 6,790 | -6,392 |
| Olmos | 7,280 | -6,882 |
| Austin Chalk | 8,040 | -7,642 |
| Austin Chalk | 8,060 | -7,662 |
| Eagle Ford | 8,190 | -7,792 |
14 TOPS · FIRST 8
Johnson42-493-33027
1.1 KM · Hominy Consulting, LLC · Section with this well →
| Navarro | 6,030 | -5,684 |
| Olmos | 7,120 | -6,774 |
| Anacacho | 7,610 | -7,264 |
| Austin Chalk | 7,645 | -7,299 |
| Buda | — | |
| Edwards | — | |
| Georgetown | — | |
| Wilcox | — |
9 TOPS · FIRST 8
Johnson42-493-33026
1.1 KM · Hominy Consulting, LLC · Section with this well →
| Navarro | 6,030 | -5,683 |
| Olmos | 7,120 | -6,773 |
| Anacacho | 7,610 | -7,263 |
| Austin Chalk | 7,645 | -7,298 |
| Wilcox | — | |
| Buda | — | |
| Eagle Ford | — | |
| Edwards | — |
9 TOPS · FIRST 8
Pena-Kutac A42-493-32932
2.2 KM · Recoil Resources Operating, Inc. · Section with this well →
| Wilcox | 3,065 | -2,660 |
| Navarro | 5,874 | -5,469 |
| Olmos | 6,511 | -6,106 |
| Anacacho | 7,487 | -7,082 |
| Austin Chalk | 7,607 | -7,202 |
| Eagle Ford | 7,864 | -7,459 |
| Buda | — | |
| Edwards | — |
9 TOPS · FIRST 8
Pena-Urbanczyk B42-493-32933
2.2 KM · Recoil Resources Operating, Inc. · Section with this well →
| Wilcox | 3,055 | -2,650 |
| Navarro | 5,863 | -5,458 |
| Olmos | 6,506 | -6,101 |
| Anacacho | 7,472 | -7,067 |
| Austin Chalk | 7,591 | -7,186 |
| Eagle Ford | 7,850 | -7,445 |
| Edwards | — | |
| Buda | — |
9 TOPS · FIRST 8
Pena-Kneupper C42-493-32934
2.2 KM · Recoil Resources Operating, Inc. · Section with this well →
| Wilcox | 3,043 | -2,638 |
| Navarro | 5,852 | -5,447 |
| Olmos | 6,508 | -6,103 |
| Anacacho | 7,460 | -7,055 |
| Austin Chalk | 7,580 | -7,175 |
| Eagle Ford | 7,838 | -7,433 |
| Georgetown | — | |
| Buda | — |
9 TOPS · FIRST 8
Valchar B42-493-32972
2.5 KM · Recoil Resources Operating, Inc. · Section with this well →
| Wilcox | 3,388 | -3,048 |
| Navarro | 6,067 | -5,727 |
| Olmos | 6,709 | -6,369 |
| Anacacho | 7,713 | -7,373 |
| Austin Chalk | 7,778 | -7,438 |
| Eagle Ford | 8,070 | -7,730 |
| Edwards | — | |
| Buda | — |
9 TOPS · FIRST 8
Valchar A42-493-32971
2.5 KM · Recoil Resources Operating, Inc. · Section with this well →
| Wilcox | 3,387 | -3,048 |
| Navarro | 6,056 | -5,717 |
| Olmos | 6,701 | -6,362 |
| Anacacho | 7,713 | -7,374 |
| Austin Chalk | 7,782 | -7,443 |
| Eagle Ford | 8,067 | -7,728 |
| Edwards | — | |
| Buda | — |
9 TOPS · FIRST 8
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/49332726, documented in the API reference.