WELL · 42-493-32745 · DISTRICT 1

Pfeil Unit #1H

Y

Wilson County · Marcelina Creek (Buda) field · Shut IN  · Horizontal

Pfeil Unit #1H (API 42-493-32745) is a horizontal well in Wilson County operated by Everest Resource Company, completed November 16, 2013 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued September 9, 2013, permitted to 6,400 ft.

Completion filings report 3 formation tops, including Austin Chalk, Eagle Ford, Buda.

Its lease has reported 39.1K barrels of oil since November 2013, last reporting in July 2026.

Operator of record

Everest Resource Company

Corpus Chrsti, TX · P-5 Y, filed Dec 4, 2025 · 113 permits on file · (361) 688-1025

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEverest Resource Company
Production reportsEverest Resource Companythrough Oct 2019
Latest permitEverest Resource CompanySep 9, 2013
6,400
total depth, ft
2
permits on file
Sep 9, 2013
last permit issued
Nov 16, 2013
completed
39.1K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2013 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 16, 2013
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Pfeil Unit O-1-18779Marcelina Creek (Buda)Everest Resource Company139.1K0Nov 2013 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Everest Resource CompanyNov 2013 → Oct 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
769272-98DrillEverest Resource CompanySep 23, 2013Sep 9, 2013Oct 8, 20136,400
769272-99DrillEverest Resource CompanyAug 30, 2013Sep 9, 2013Oct 6, 20136,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-18779————

Formation tops

As filed on W-2/G-1. Subsea from 424 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk5,575-5,151
Eagle FordEAGLEFORD6,020-5,596
Buda6,065-5,641

Perforations

Perforated and open-hole intervals.

FromToType
6,33111,760Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.754,11614.752,472 S
7.6256,3319.875679 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 13, 2016Oct 8, 2014Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49332745, documented in the API reference.