WELL · 42-493-32803 · DISTRICT 1
Mays #1
Wilson County · LA Vernia (Austin Chalk) field · Shut IN · Vertical
Mays #1 (API 42-493-32803) is a well in Wilson County operated by Texstar Oil & Gas LLC, completed September 10, 2015 and listed as shut in on the RRC schedule.
The RRC has issued one drilling permit, issued November 18, 2014, permitted to 3,000 ft.
Completion filings report 9 formation tops, including Wilcox, Navarro, Olmos, Anacacho.
Its lease has reported 409 barrels of oil since September 2015, last reporting in July 2026.
Operator of record
Luling, TX · P-5 Y, filed May 4, 2026 · 1 permits on file · (920) 904-5794
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Texstar Oil & Gas LLC |
| Production reports | Texstar Oil & Gas, LLCthrough May 2020 |
| Latest permit | Texstar Oil & Gas, LLCNov 18, 2014 |
- 3,000
- total depth, ft
- 1
- permits on file
- Nov 18, 2014
- last permit issued
- Sep 10, 2015
- completed
- 409
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 2015 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Sep 10, 2015
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Mays O-1-18644 | LA Vernia (Austin Chalk) | Texstar Oil & Gas, LLC | 1 | 409 | 0 | Sep 2015 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Texstar Oil & Gas, LLCApr 2016 → May 2020
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 800276-99 | Drill | Texstar Oil & Gas, LLC | Nov 14, 2014 | Nov 18, 2014 | Jan 17, 2015 | 3,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-18644 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 617 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| WilcoxWILCOX - DISPOSAL | 742 | -125 |
| Navarro | 1,455 | -838 |
| Olmos | 1,755 | -1,138 |
| AnacachoANACACHO - H2S | 2,372 | -1,755 |
| Austin ChalkAUSTIN CHALK - H2S | 2,545 | -1,928 |
| Eagle FordEAGLE FORD - H2S | 2,785 | -2,168 |
| BudaBUDA - H2S | 2,813 | -2,196 |
| EdwardsEDWARDS - H2S, DISPOSAL | — | — |
| GeorgetownGEORGETOWN - H2S | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,630 | 2,642 | Perforated |
| 2,677 | 2,686 | Perforated |
| 2,696 | 2,718 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 518 | 12.25 | 245 S |
| 5.5 | 2,843 | 7.875 | 400 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 3, 2016 | Nov 18, 2015 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-493-32803 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-493-32803 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/49332803, documented in the API reference.