WELL · 42-495-01878 · DISTRICT 8

Gulf GV #1

Plugged

Winkler County · War-Wink (Cherry Canyon) field  · Vertical

Gulf GV #1 (API 42-495-01878) is a plugged well in Winkler County, plugged April 2, 2001, last operated by Sapient Energy Corp.

The RRC has issued one drilling permit, issued October 21, 1996, permitted to 7,700 ft.

It was permitted by Stevens & Tull, Inc. and has since transferred to Sapient Energy Corp on the wellbore schedule.

Completion filings report 4 formation tops, including T/Delaware, T/Cherry Canyon, T/Manzanita, T/Lower Cherry Canyon.

Its lease has reported 611 barrels of oil and 294 mcf of gas since December 1996, last reporting in September 2001.

Operator of record

Sapient Energy Corp

Permitted by Stevens & Tull, Inc.; the EWA schedule now lists a different operator.

Oklahoma City, OK · P-5 Y, filed May 3, 2002 · 1 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSapient Energy Corp
Production reportsStevens & Tull, Inc.through May 1997
Latest permitStevens & Tull, Inc.Oct 21, 1996

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,700
total depth, ft
1
permits on file
Oct 21, 1996
last permit issued
Dec 5, 1996
completed
611
cumulative oil, bbl
294
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 1996 THROUGH Sep 2001

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 5, 1996
Shut in
—
Plugged
Apr 2, 2001

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Gulf GV O-10-35149War-Wink (Cherry Canyon)Sapient Energy Corp1611294Dec 1996 – Sep 2001

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Stevens & Tull, Inc.Dec 1996 → May 1997

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
453995-99ReenterStevens & Tull, Inc.Oct 17, 1996Oct 21, 1996Oct 30, 19967,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-35149————

Formation tops

As filed on W-2/G-1. Subsea from 2,732 ft elevation.Download CSV →

FormationMD ftSubsea
T/Delaware4,994-2,262
T/Cherry Canyon5,768-3,036
T/Manzanita6,100-3,368
T/Lower Cherry Canyon7,098-4,366

Perforations

Perforated and open-hole intervals.

FromToType
7,0987,108Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7584812.25550 S
5.57,2367.875690 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 5, 1997Dec 17, 1996Yes
00Jan 17, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49501878, documented in the API reference.