WELL · 42-495-05541 · DISTRICT 8

Campbell Tr. 9 #4

Plugged

Winkler County · Kermit South (Devonian-Oil) field  · Vertical

Campbell TR. 9 #4 (API 42-495-05541) is a plugged well in Winkler County, plugged June 12, 2019, last operated by Carlow Corp..

The RRC has issued 2 drilling permits between 2000 and 2003, permitted to 10,500 ft.

Completion filings report 3 formation tops, including Devonian, Montoya, Simpson.

Its 4 leases have reported 7.73K barrels of oil and 13.3K mcf of gas since January 1993, last reporting in February 2021. The leases carry 29 wells, so these are lease totals, not this well alone.

Operator of record

Carlow Corp.

Midland, TX · P-5 Y, filed Sep 3, 2021 · 115 permits on file · (432) 638-0003

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCarlow Corp.
Production reportsCarlow Corp.through May 2019
Latest permitCarlow Corp.Aug 8, 2003
10,500
total depth, ft
2
permits on file
Aug 8, 2003
last permit issued
Feb 23, 2001
completed
7.73K
cumulative oil, bbl
13.3K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 2021

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 23, 2001
Shut in
—
Plugged
Jun 12, 2019

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 29 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Campbell Tr. 9 O-10-37211Kermit (McKee)Carlow Corp.1881.87KDec 2003 – Feb 2021
Kermit, South Devonian Unit O-10-36260Kermit, South (Devonian-Oil)Carlow Corp.251.18K1.81KFeb 2000 – Jun 2013
Campbell Tr. 9 O-10-36856Kermit, South (Devonian-Oil)Carlow Corp.100Apr 2002 – Feb 2004
Campbell, Seth, -J- O-10-14722Kermit, South (Devonian-Oil)Apache Corporation26.46K9.65KJan 1993 – Apr 1998

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Jan 1993 → Apr 1995
  2. 2Apache CorporationMay 1995 → Dec 1995
  3. 3Carlow Corp.Feb 2000 → May 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
535118-99RecompletionCarlow Corp.Aug 8, 2003Aug 8, 2003Aug 10, 200310,500
498198-99ReenterCarlow Corp.Aug 7, 2000Aug 7, 2000Nov 22, 20008,841

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-14722————
—— O-10-36260————
—— O-10-36856————
—— O-10-37211————

Formation tops

As filed on W-2/G-1. Subsea from 2,896 ft elevation.Download CSV →

FormationMD ftSubsea
Devonian8,645-5,749
Montoya9,490-6,594
Simpson10,280-7,384

Perforations

Perforated and open-hole intervals.

FromToType
8,6748,778Perforated
10,37810,480Perforated
—8,658Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,16017.5750 S
13.3751,160——
8.6253,950111,475 S
8.6253,950——
2.3758,675——
5.58,8407.8751,300 S
5.58,840——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 8, 2004Dec 9, 2003Yes
00Feb 12, 2004Feb 27, 2001Yes
00May 31, 2002Feb 27, 2001Yes
00Aug 16, 2001Feb 27, 2001Yes
00Jun 1, 2001——
00Jan 12, 1984Jan 22, 1960—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Aug 2000
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000089772H-1 InjectionPlugged Jul 9, 20195,0004,1008,665–8,800

MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS

Last 12 months 0

012000

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49505541, documented in the API reference.