WELL · 42-495-06107 · DISTRICT 8

Ppool C. H. #30W

N

Winkler County · Keystone (Colby) field  · Vertical

Ppool C. H. #30W (API 42-495-06107) is a well in Winkler County operated by Hard Rock O&G, completed May 7, 1957.

The RRC has issued one drilling permit, issued March 29, 1990, permitted to 3,297 ft.

It was permitted by Bps CO. and has since transferred to Hard Rock O&G on the wellbore schedule.

Completion filings report 3 formation tops, including Yates, Colby Sand, Colby Sd.

Its lease has reported 32.9K barrels of oil and 29.4K mcf of gas since January 1993, last reporting in July 2026. The lease carries 5 wells, so these are lease totals, not this well alone.

Operator of record

Hard Rock O&G

Permitted by BPS Co.; the EWA schedule now lists a different operator.

Abilene, TX · P-5 Y, filed Apr 4, 2026 · (432) 270-5998

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHard Rock O&G
Production reportsApv McCamey LLCthrough Feb 2021
Latest permitBPS Co.Mar 29, 1990

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,297
total depth, ft
1
permits on file
Mar 29, 1990
last permit issued
May 7, 1957
completed
32.9K
cumulative oil, bbl
29.4K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 7, 1957
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Ppool, C. H. O-10-3326Keystone (Colby)Hard Rock O&G532.9K29.4KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1BPS Co.Jan 1993 → Nov 1997
  2. 2Daniel Oil & GasDec 1997 → Nov 2003
  3. 3Griffin Petroleum CompanyDec 2003 → Feb 2008
  4. 4Neostar Energy Co.Mar 2008 → Apr 2008
  5. 5JRC PetroleumJan 2009 → Jul 2010
  6. 67S Oil & Gas, LLCAug 2017 → Feb 2018
  7. 7Arch Oil & Gas, LLCMar 2018 → Feb 2019
  8. 8Apv McCamey LLCAug 2019 → Feb 2021

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
370988-99DrillBPS Co.Mar 15, 1990Mar 29, 1990—3,297

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-3326————

Formation tops

As filed on W-2/G-1. Subsea from 2,894 ft elevation.Download CSV →

FormationMD ftSubsea
YatesYATES SAND2,460434
YatesYATES SD2,460434
Colby Sand3,198-304
Colby SD3,198-304

Perforations

Perforated and open-hole intervals.

FromToType
3,1893,290Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62533712.25350 S
5.53,1897.875409 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 27, 1990Mar 15, 1990—
00Jun 5, 1990Aug 23, 1989—
00Sep 12, 1989Aug 23, 1989—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

58K
bbl, last 12 reported months
139K
bbl, all reported
Jun 1990
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000016698UIC PermitCanceled Mar 21, 1991509753,189–3,290

MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS

Last 12 months 57,956

05K10K15K1990

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49506107, documented in the API reference.