WELL · 42-495-30914 · DISTRICT 8

A. G. Hill #1

N

Winkler County  · Directional

A. G. Hill #1 (API 42-495-30914) is a permitted well in Winkler County filed by Heritage Standard Corporation; no completion report is on file yet.

The RRC has issued 4 drilling permits (amended twice) between 1978 and 2008, permitted to 22,000 ft.

Completion filings report one formation top, including Atoka.

Operator of record

Heritage Standard Corporation

Dallas, TX · P-5 Y, filed Mar 4, 2026 · 14 permits on file · (214) 912-2211

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsMatador Production Companythrough Apr 2026
Latest permitHeritage Standard CorporationJan 29, 2008
22,000
total depth, ft
6
permits on file
Jan 29, 2008
last permit issued
—
completed
0
cumulative oil, bbl
6.16M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hill, A. G. G-10-245709Cheyenne (Atoka)Matador Production Company105.95MDec 2008 – Jul 2026
Hill, A. G. G-10-79016Cheyenne (Atoka)Enserch Exploration, Inc10214KJan 1993 – Nov 1995
Hill, A. G. G-10-89792Cheyenne (Fusselman)Enserch Exploration, Inc100Jan 1993 – Sep 1995

Gas, mcf lease total

Last 12 months 257,549 · prior 12 253,967(+1%)

020K40K60K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1EP Operating Limited PartnershipJan 1993 → Feb 1995
  2. 2Enserch Exploration, IncMar 1995 → Apr 1995
  3. 3Heritage Standard CorporationDec 2008 → Sep 2013
  4. 4Traton Operating CompanyOct 2013 → Sep 2016
  5. 5Impetro Operating LLCOct 2016 → Nov 2020
  6. 6Ameredev Operating, LLCDec 2020 → May 2024
  7. 7Ameredev Texas, LLCJun 2024 → Jan 2025
  8. 8Matador Production CompanyFeb 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
653968-97ReenterHeritage Standard CorporationDec 4, 2008Jan 29, 2008Jan 29, 200815,100
653968-98ReenterLakehills Production, Inc.Jul 23, 2008Jan 29, 2008Jan 29, 200815,000
653968-99ReenterStratco Operating Co., Inc.Jan 24, 2008Jan 29, 2008Jan 29, 200815,000
71802-99RecompletionGifford, Mitchell & WisenbakerFeb 5, 1980Feb 5, 1980—21,954
71799-99OtherGifford, Mitchell & WisenbakerJan 7, 1980Jan 7, 1980—21,954
17163-99DrillGifford, Mitchell & WisenbakerJan 27, 1978Jan 27, 1978Mar 24, 197822,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-10-79016————
—— G-10-89792————
—— G-10-245709————

Formation tops

As filed on W-2/G-1. Subsea from 2,845 ft elevation.Download CSV →

FormationMD ftSubsea
Atoka14,686-11,841

Perforations

Perforated and open-hole intervals.

FromToType
14,60214,624Perforated
14,68614,702Open hole
19,66419,673Perforated
21,69121,926Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
201,255262,500 S
13.3753,46717.52,265 S
19.62513,47812.255,500 S
9.62513,47812.255,500 S
9.62513,50012.255,500 S
2.87514,413——
3.516,245——
2.87516,245——
3.516,254——
3.517,254——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 27, 2009Jan 20, 2009—
00Mar 19, 2009——
00Jan 12, 1984Oct 8, 1980—
00Jan 12, 1984Oct 17, 1978—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49530914, documented in the API reference.