WELL · 42-495-31328 · DISTRICT 10

Evans, Mary Kate et AL #KCM-#1

Plugged

Winkler County  · Vertical

Evans, Mary Kate ET AL #KCM-#1 (API 42-495-31328) is a plugged well in Winkler County, plugged August 30, 1981, last operated by Phoenix Resources CO..

The RRC has issued one drilling permit, issued March 13, 1981, permitted to 11,760 ft.

Operator of record

Phoenix Resources Co.

Nichols Hill, OK · P-5 Y, filed Jun 3, 1992 · 47 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitPhoenix Resources Co.Mar 13, 1981
11,760
total depth, ft
1
permits on file
Mar 13, 1981
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Aug 30, 1981

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
112124-99DrillPhoenix Resources Co.Mar 13, 1981Mar 13, 1981—11,760

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49531328, documented in the API reference.