WELL · 42-495-31488 · DISTRICT 8

Campbell -D- #3

N

Winkler County · Keystone (Colby) field  · Vertical

Campbell -D- #3 (API 42-495-31488) is a well in Winkler County operated by Bell Energy, completed May 1, 1982.

The RRC has issued one drilling permit, issued April 9, 1982, permitted to 3,500 ft.

It was permitted by Jem Resources, Inc. and has since transferred to Bell Energy on the wellbore schedule.

Completion filings report 3 formation tops, including Russler, Yates, Queen.

Its 2 leases have reported 111K barrels of oil and 51.3K mcf of gas since January 1993, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 1.14K barrels injected in the 12 months reported through August 2025.

Operator of record

Bell Energy

Permitted by Jem Resources, Inc.; the EWA schedule now lists a different operator.

Kermit, TX · P-5 Y, filed Jul 4, 2026 · (432) 208-0686

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBell Energy
Production reportsBell Energythrough Feb 2023
Latest permitJem Resources, Inc.Apr 9, 1982

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,500
total depth, ft
1
permits on file
Apr 9, 1982
last permit issued
May 1, 1982
completed
111K
cumulative oil, bbl
51.3K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 1, 1982
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Lee Campbell O-10-38558Keystone (Colby)Kermit SWD, Inc.100Feb 2008 – Jul 2026
Campbell -D- O-10-30873Keystone (Colby)Bell Energy2111K51.3KJan 1993 – Dec 2024

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Reata ResourcesJan 1993 → Sep 2007
  2. 2Bell EnergyOct 2007 → Feb 2023
  3. 3Custer & Wright Operating, Inc.Dec 2010 → Jan 2018

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
156820-99DrillJem Resources, Inc.Apr 9, 1982Apr 9, 1982Apr 15, 19823,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-30873————
—— O-10-38558————

Formation tops

As filed on W-2/G-1. Subsea from 2,873 ft elevation.Download CSV →

FormationMD ftSubsea
Russler9151,958
Yates2,535338
Queen3,250-377

Perforations

Perforated and open-hole intervals.

FromToType
3,2663,367Perforated
3,3203,365Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,20012.25660 S
23,370——
5.53,4967.875620 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 11, 2009Mar 30, 2009—
00Feb 25, 2008Jun 4, 1982—
00Oct 15, 1986Jun 4, 1982—
00Oct 1, 1986——
00Jan 12, 1984Jun 4, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

1.14K
bbl, last 12 reported months
735K
bbl, all reported
Aug 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000098633H-1 InjectionActive2,0001,5003,250–3,450

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 1,141 · prior 12 5,596(-80%)

05001K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49531488, documented in the API reference.