WELL · 42-495-31518 · DISTRICT 8

Morton #4

Plugged

Winkler County · Halley field  · Vertical

Morton #4 (API 42-495-31518) is a plugged well in Winkler County, plugged November 15, 2000, last operated by T&D Oil.

The RRC has issued one drilling permit, issued September 27, 1982, permitted to 3,000 ft.

It was permitted by A & B Oil and has since transferred to T&D Oil on the wellbore schedule.

Its lease has reported 20.2K barrels of oil and 86 mcf of gas since January 1993, last reporting in July 2026. The lease carries 5 wells, so these are lease totals, not this well alone.

Operator of record

T&D Oil

Permitted by A & B Oil; the EWA schedule now lists a different operator.

Christoval, TX · P-5 Y, filed Feb 4, 2026 · (432) 227-3177

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleT&D Oil
Production reportsT&D Oilthrough Apr 2026
Latest permitA & B OilSep 27, 1982

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,000
total depth, ft
1
permits on file
Sep 27, 1982
last permit issued
Sep 28, 1982
completed
20.2K
cumulative oil, bbl
86
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 28, 1982
Shut in
—
Plugged
Nov 15, 2000

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Morton O-10-21630HalleyT&D Oil520.2K86Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 617 · prior 12 719(-14%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Equayla Oil CompanyFeb 1993 → May 1994
  2. 2Eado ProductionAug 1994 → Mar 1997
  3. 3Eado Production, Inc.Apr 1997 → May 2001
  4. 4SDG Resources L.P.Jun 2001 → May 2006
  5. 5Torch Energy Services, Inc.Jun 2006 → Dec 2008
  6. 6Resaca Operating CompanyJan 2009 → Jun 2013
  7. 7Roswell Operating, LLCJul 2013 → Jul 2014
  8. 8Cavalcade Operating Company LLCApr 2015 → Apr 2015
  9. 9T&D OilJun 2016 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
172919-99DrillA & B OilSep 27, 1982Sep 27, 1982Sep 29, 19823,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-21630————

Perforations

Perforated and open-hole intervals.

FromToType
2,7582,837Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62556210.25310 S
8.62556212.25384 S
2.3752,750——
5.52,9207.875600 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 23, 1995Feb 2, 1995—
00Jan 12, 1984Feb 15, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

7.03K
bbl, last 12 reported months
60.3K
bbl, all reported
Aug 2000
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000082000H-1 InjectionPlugged Dec 4, 20002001,0002,758–2,837

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 7,030 · prior 12 5,660(+24%)

05001K1.5K19992000

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49531518, documented in the API reference.