WELL · 42-495-32187 · DISTRICT 8
Daugherty-Leck -M- #1
Winkler County · Monument Draw (Tansill) field · Vertical
Daugherty-Leck -M- #1 (API 42-495-32187) is a plugged well in Winkler County, plugged December 22, 2017, last operated by Hopewell Operating Inc..
The RRC has issued 2 drilling permits between 1988 and 2006, permitted to 3,500 ft.
Completion filings report one formation top, including Yates.
Its 2 leases have reported 3.55K barrels of oil and 49.3K mcf of gas since January 1993, last reporting in July 2024. The leases carry 4 wells, so these are lease totals, not this well alone.
Operator of record
Shreveport, LA · P-5 Y, filed Oct 4, 2025 · 118 permits on file · (800) 256-2390
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hopewell Operating Inc. |
| Production reports | Hopewell Operating, Inc.through Sep 2016 |
| Latest permit | Hopewell Operating, Inc.Jun 16, 2006 |
- 3,500
- total depth, ft
- 2
- permits on file
- Jun 16, 2006
- last permit issued
- Jul 6, 2005
- completed
- 3.55K
- cumulative oil, bbl
- 49.3K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2024
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 6, 2005
- Shut in
- —
- Plugged
- Dec 22, 2017
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Daugherty-Leck -M- G-10-220610 | Monument Draw (Tansill) | Hopewell Operating, Inc. | 1 | 0 | 40.3K | Jul 2005 – Jul 2024 |
| Daugherty-Leck -M- O-10-31861 | Scarborough | Hopewell Operating, Inc. | 3 | 3.55K | 9K | Jan 1993 – Jan 2017 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1RBD-Shelby AgencyJan 1993 → Aug 1993
- 2Shelby, Michael H.Sep 1993 → Jan 1994
- 3Hopewell Operating, Inc.Feb 1994 → Sep 2016
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 618741-99 | Recompletion | Hopewell Operating, Inc. | May 4, 2006 | Jun 16, 2006 | Jul 25, 2005 | 3,472 |
| 345630-99 | Drill | Rad Oil Company | Apr 25, 1988 | Apr 27, 1988 | — | 3,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-10-220610 | — | — | — | — |
| — | — O-10-31861 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,680 | 2,689 | Perforated |
| 2,921 | 2,932 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 621 | 12.25 | 375 S |
| 5.5 | 3,472 | 7.875 | 275 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 20, 2007 | Jul 26, 2006 | — |
| 00 | Apr 20, 2007 | — | — |
| 00 | Nov 1, 2006 | — | — |
| 00 | Jul 25, 1988 | Jun 24, 1988 | Yes |
| 00 | Jul 19, 1988 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-495-32187 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-495-32187 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.