WELL · 42-495-32673 · DISTRICT 8

Halley S. #12

Y

Winkler County · Weiner (McKee) field · SWR-10-Well  · Vertical

Halley S. #12 (API 42-495-32673) is a well in Winkler County operated by Permex Petroleum Corporation, completed February 16, 2001 and listed as swr-10-well on the RRC schedule.

The RRC has issued 2 drilling permits between 1997 and 2000, permitted to 11,500 ft.

It was permitted by Texaco E & P Inc. and has since transferred to Permex Petroleum Corporation on the wellbore schedule.

Completion filings report 7 formation tops, including Waddell, Wadell, Ellen., Ellenbruger.

No lease production has been reported under this well’s leases.

Operator of record

Permex Petroleum Corporation

Permitted by Texaco E & P Inc.; the EWA schedule now lists a different operator.

Graham, TX · P-5 Y, filed May 4, 2026 · 4 permits on file · (719) 661-4442

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePermex Petroleum Corporation
Production reportsRuckus Energy Operating, LLCthrough Oct 2023
Latest permitTexaco E & P Inc.Sep 7, 2000

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,500
total depth, ft
2
permits on file
Sep 7, 2000
last permit issued
Feb 16, 2001
completed
0
cumulative oil, bbl
1.97M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 1997 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 16, 2001
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Delinquent

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Halley, S. G-10-166715Emperor (Waddell)Permex Petroleum Corporation101.97MSep 1997 – Jul 2026
Halley, S. G-10-183084Weiner (McKee)Permex Petroleum Corporation100Feb 2001 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 0

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Sep 1997 → May 2002
  2. 2Chevron U. S. A. Inc.Jun 2002 → Feb 2022
  3. 3Ruckus Energy Operating, LLCMar 2022 → Oct 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
499104-99RecompletionTexaco E & P Inc.Aug 31, 2000Sep 7, 2000Jan 15, 200111,500
461892-99DrillTexaco E & P Inc.May 2, 1997May 7, 1997Jun 2, 199711,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-10-166715————
—— G-10-183084————

Formation tops

As filed on W-2/G-1. Subsea from 2,778 ft elevation.Download CSV →

FormationMD ftSubsea
Waddell11,156-8,378
Wadell11,156-8,378
Ellen.11,412-8,634
Ellenbruger11,412-8,634
Ellenburger11,412-8,634
Gal. Methanol 32000 SCFN2——
Gal. Methanol, 32000 SCFN2——

Perforations

Perforated and open-hole intervals.

FromToType
10,82410,832Perforated
11,15611,177Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
11.751,26514.75951 S
8.6254,00011840 S
5.511,4127.875300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 20, 2001Mar 20, 2001—
00Aug 16, 2001Jan 26, 2001—
00Jul 11, 2001——
00Apr 30, 1998Jan 21, 1998Yes
00Apr 29, 1998Jan 5, 1998—
00Mar 5, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49532673, documented in the API reference.