WELL · 42-495-32727 · DISTRICT 8

University 47-21 #4

Plugged

Winkler County · War-Wink (Cherry Canyon) field  · Vertical

University 47-21 #4 (API 42-495-32727) is a plugged well in Winkler County, plugged September 20, 2017, last operated by Pilot Water Solutions Swd LLC.

The RRC has issued one drilling permit, issued June 17, 1998, permitted to 7,300 ft.

It was permitted by Eex Corporation and has since transferred to Pilot Water Solutions Swd LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Delaware, Cherry Canyon, B. Manzinita, B. Manzinta.

Its lease has reported 410K barrels of oil and 476K mcf of gas since May 1996, last reporting in June 2024. The lease carries 8 wells, so these are lease totals, not this well alone.

Operator of record

Pilot Water Solutions SWD LLC

Permitted by Eex Corporation; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Mar 4, 2026 · 2 permits on file · (432) 699-9366

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePilot Water Solutions SWD LLC
Production reportsFelix Water, LLCthrough Aug 2019
Latest permitEex CorporationJun 17, 1998

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,300
total depth, ft
1
permits on file
Jun 17, 1998
last permit issued
Jun 1, 2000
completed
410K
cumulative oil, bbl
476K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 1996 THROUGH Jun 2024

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 1, 2000
Shut in
—
Plugged
Sep 20, 2017

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 8 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
University 47-21 O-10-34919War-Wink (Cherry Canyon)Pilot Water Solutions SWD LLC8410K476KMay 1996 – Jun 2024

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Enserch Exploration, IncMay 1996 → Mar 1998
  2. 2Eex CorporationApr 1998 → Oct 1998
  3. 3Taurus Exploration U.S.A., Inc.Nov 1998 → Nov 1998
  4. 4Energen Resources CorporationDec 1998 → May 2016
  5. 5Felix Energy Holdings II, LLCJun 2016 → Apr 2019
  6. 6Felix Water, LLCAug 2019 → Aug 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
477243-99DrillEex CorporationJun 17, 1998Jun 17, 1998Jul 2, 19987,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-34919————

Formation tops

As filed on W-2/G-1. Subsea from 2,714 ft elevation.Download CSV →

FormationMD ftSubsea
Delaware4,983-2,269
Cherry Canyon5,830-3,116
B. Manzinita6,083-3,369
B. Manzinta6,083-3,369
Brushy Canyon7,078-4,364

Perforations

Perforated and open-hole intervals.

FromToType
6,8286,848Perforated
6,9126,930Perforated
6,9127,010Perforated
6,9626,970Perforated
6,9726,978Perforated
6,9937,004Perforated
7,0077,010Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,62812.251,150 S
8.6252,62812.51,150 S
5.57,3007.875450 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 7, 2001Aug 15, 2000—
00Oct 19, 1998Sep 10, 1998Yes
00Oct 1, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49532727, documented in the API reference.