WELL · 42-495-32946 · DISTRICT 8
Campbell Hendrick B #11
Winkler County · Kermit field · Producing · Vertical
Campbell Hendrick B #11 (API 42-495-32946) is a well in Winkler County operated by Petex, completed August 14, 2004 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit (amended once), issued May 19, 2004, permitted to 3,200 ft.
It was permitted by Mccabe Energy, Inc. and has since transferred to Petex on the wellbore schedule.
Completion filings report 3 formation tops, including Yates, Seven Rivers, Queen.
Its lease has reported 147K barrels of oil and 116K mcf of gas since February 2004, last reporting in July 2026. The lease carries 8 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by McCabe Energy, Inc.; the EWA schedule now lists a different operator.
Breckenridge, TX · P-5 Y, filed May 4, 2026 · 124 permits on file · (254) 559-5453
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Petex |
| Production reports | Petexthrough Apr 2026 |
| Latest permit | McCabe Energy, Inc.May 19, 2004 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,200
- total depth, ft
- 2
- permits on file
- May 19, 2004
- last permit issued
- Aug 14, 2004
- completed
- 147K
- cumulative oil, bbl
- 116K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 2004 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Aug 14, 2004
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 8 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Campbell Hendrick "B" O-10-37338 | Kermit | Petex | 8 | 147K | 116K | Feb 2004 – Jul 2026 |
Oil, barrels lease total
Last 12 months 1,956 · prior 12 1,433(+36%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1McCabe Energy, Inc.Feb 2004 → Feb 2006
- 2Breck Operating Corp.Mar 2006 → Dec 2018
- 3PetexJan 2019 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 545907-98 | Drill | McCabe Energy, Inc. | May 26, 2004 | May 19, 2004 | Jun 11, 2004 | 3,200 |
| 545907-99 | Drill | McCabe Energy, Inc. | May 19, 2004 | May 19, 2004 | — | 3,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-37338 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,838 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Yates | 2,434 | 404 |
| Seven Rivers | 2,705 | 133 |
| Queen | 2,870 | -32 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,872 | 3,092 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 630 | 11 | 545 S |
| 5.5 | 3,177 | 7.875 | 550 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 28, 2004 | Sep 17, 2004 | Yes |
| 00 | Oct 26, 2004 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-495-32946 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-495-32946 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/49532946, documented in the API reference.