WELL · 42-495-34053 · DISTRICT 10

Spanish Dagger 21-27 #1

N

Winkler County  · Vertical

Spanish Dagger 21-27 #1 (API 42-495-34053) is a former disposal or injection well in Winkler County, last operated by Felix Water, LLC; its UIC permit is no longer active.

The RRC has issued one drilling permit, issued February 5, 2018, permitted to 8,000 ft.

Operator of record

Felix Water, LLC

Gary, TX · P-5 Inactive, filed Feb 26, 2021 · 70 permits on file · (903) 754-1034

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitFelix Water, LLCFeb 5, 2018
8,000
total depth, ft
1
permits on file
Feb 5, 2018
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
835925-99DrillFelix Water, LLCFeb 3, 2018Feb 5, 2018—8,000

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Aug 2024
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000116275W-14 DisposalCanceled Sep 15, 202430,0002,5555,110–7,475

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120232024

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49534053, documented in the API reference.