WELL · 42-497-20087 · DISTRICT 9

Conley Frances B. #2

Plugged

Wise County · Bridgeport (Tidwell) field  · Vertical

Conley Frances B. #2 (API 42-497-20087) is a plugged well in Wise County, plugged December 15, 2000, last operated by Mitchell Energy Company L.P..

The RRC has issued one drilling permit, issued June 16, 1988, permitted to 6,188 ft.

It was permitted by Mitchell Energy Corporation and has since transferred to Mitchell Energy Company L.P. on the wellbore schedule.

Operator of record

Mitchell Energy Company L.P.

Permitted by Mitchell Energy Corporation; the EWA schedule now lists a different operator.

Spring, TX · P-5 Y, filed Oct 5, 2001 · 650 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMitchell Energy Company L.P.
Production reportsMitchell Energy Corporationthrough Feb 1994
Latest permitMitchell Energy CorporationJun 16, 1988

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,188
total depth, ft
1
permits on file
Jun 16, 1988
last permit issued
Jun 9, 1988
completed
0
cumulative oil, bbl
1.18K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Dec 2000

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 9, 1988
Shut in
—
Plugged
Dec 15, 2000

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Conley, Frances B. G-13-128468Bridgeport (Tidwell)Mitchell Energy Corporation101.18KJan 1993 – Dec 2000

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mitchell Energy CorporationJan 1993 → Feb 1994

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
347863-99RecompletionMitchell Energy CorporationJun 16, 1988Jun 16, 1988—6,188

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-13-128468————

Perforations

Perforated and open-hole intervals.

FromToType
4,3404,355Perforated
5,4845,797Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62533212.25—
4.54,4387.875300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 1, 1988Sep 14, 1988Yes
00Oct 21, 1988——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49720087, documented in the API reference.