WELL · 42-497-30530 · DISTRICT 9
Long, J. J. "B" #3
Wise County · Vertical
Long, J. J. "B" #3 (API 42-497-30530) is a disposal or injection well in Wise County operated by EP Operating Company under an active UIC permit.
The RRC has issued 2 drilling permits between 1977 and 1987, permitted to 5,817 ft.
Completion filings report 2 formation tops, including Caddo, Mississippian.
It holds an active disposal or injection permit.
Operator of record
Dallas, TX · P-5 Y, filed Jan 5, 1993 · 568 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | EP Operating CompanyJan 29, 1987 |
- 5,817
- total depth, ft
- 2
- permits on file
- Jan 29, 1987
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Meeks "2 A" O-13-18765 | Boonsville (5480) | Tree Operating, LLC | 1 | 0 | 0 | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 324389-99 | Recompletion | EP Operating Company | Dec 15, 1986 | Jan 29, 1987 | — | 5,817 |
| 13669-99 | Drill | Amco Energy Corp. | Nov 29, 1977 | Nov 29, 1977 | Feb 12, 1977 | 5,817 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-18765 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 946 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Caddo | 5,027 | -4,081 |
| MississippianMISSISSIPPI | 5,753 | -4,807 |
| Mississippian | 5,753 | -4,807 |
| Caddo | 5,800 | -4,854 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,776 | 5,796 | Perforated |
| 5,926 | 5,936 | Perforated |
| — | 5,936 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 226 | 13.25 | — |
| 8.625 | 260 | 12.25 | 170 S |
| 4.5 | 5,817 | 7.875 | 245 S |
| 4.5 | 5,953 | 7.875 | 185 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 6, 2001 | Mar 5, 2001 | — |
| 00 | Nov 4, 1988 | Oct 4, 1988 | — |
| 00 | Jul 23, 1986 | Mar 4, 1985 | — |
| 00 | Jun 4, 1985 | — | — |
| 00 | Jan 12, 1984 | May 20, 1977 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-497-30530 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-497-30530 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 185K
- bbl, all reported
- Oct 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000031157 | W-14 Disposal | Active | 250 | 200 | 5,926–5,936 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/49730530, documented in the API reference.