WELL · 42-497-31891 · DISTRICT 9
Morris Arlon #1
Wise County · Chico West (Conglomerate 5700) field · Vertical
Morris Arlon #1 (API 42-497-31891) is a plugged well in Wise County, plugged October 18, 1994, last operated by CD Consulting & Operating CO..
The RRC has issued one drilling permit, issued June 20, 1980, permitted to 6,000 ft.
It was permitted by Walker, R.P. and has since transferred to CD Consulting & Operating CO. on the wellbore schedule.
Its 2 leases have reported 71 barrels of oil and 31K mcf of gas since January 1993, last reporting in December 1994. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Walker, R.P.; the EWA schedule now lists a different operator.
Bridgeport, TX · P-5 Inactive, filed Jul 22, 2025 · 56 permits on file · (940) 683-2241
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | CD Consulting & Operating Co. |
| Production reports | CD Consulting & Operating Co.through Aug 1994 |
| Latest permit | Walker, R.P.Jun 20, 1980 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,000
- total depth, ft
- 1
- permits on file
- Jun 20, 1980
- last permit issued
- Apr 17, 1981
- completed
- 71
- cumulative oil, bbl
- 31K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Dec 1994
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 17, 1981
- Shut in
- —
- Plugged
- Oct 18, 1994
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Morris, Arlon G-13-146530 | Chico, West (Conglomerate 5700) | CD Consulting & Operating Co. | 1 | 0 | 22.9K | Jun 1993 – Dec 1994 |
| Morris, Arlon O-13-20988 | Chico, West (Conglomerate 5700) | CD Consulting & Operating Co. | 1 | 71 | 8.11K | Jan 1993 – Jan 1994 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1CD Consulting & Operating Co.Jan 1993 → Aug 1994
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 84509-99 | Drill | Walker, R.P. | Jun 20, 1980 | Jun 20, 1980 | — | 6,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-13-146530 | — | — | — | — |
| — | — O-13-20988 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,310 | 5,316 | Perforated |
| 5,516 | 5,522 | Perforated |
| 5,614 | 5,629 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 255 | 12.25 | 185 S |
| 2.375 | 5,498 | — | — |
| 4.5 | 5,713 | 7.875 | 450 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 21, 1993 | Jul 22, 1993 | — |
| 00 | Sep 28, 1993 | — | — |
| 00 | Jan 12, 1984 | Apr 28, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-497-31891 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-497-31891 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/49731891, documented in the API reference.