WELL · 42-497-32342 · DISTRICT 9
Kent #1
Wise County · Chico West (Conglomerate 5700) field · Vertical
Kent #1 (API 42-497-32342) is a well in Wise County operated by Taylor Oper. CO., completed July 8, 1982.
The RRC has issued 3 drilling permits between 1982 and 1983, permitted to 6,000 ft.
Completion filings report 3 formation tops, including Strawn, Caddo, Atoka.
No lease production has been reported under this well’s leases.
Operator of record
Bridgeport, TX · P-5 Y, filed Sep 15, 1988 · 264 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Taylor Oper. Co. |
| Production reports | Stephens & Johnson Operating Co.through Apr 2026 |
| Latest permit | Taylor Oper. Co.Nov 9, 1983 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,000
- total depth, ft
- 3
- permits on file
- Nov 9, 1983
- last permit issued
- Jul 8, 1982
- completed
- 0
- cumulative oil, bbl
- 531K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 8, 1982
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Kent G-13-114591 | Alvord (Caddo Conglomerate) | Stephens & Johnson Operating Co. | 1 | 0 | 531K | Jan 1993 – Jul 2026 |
Gas, mcf lease total
Last 12 months 6,818 · prior 12 9,056(-25%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1S & J Operating Co.Jan 1993 → Aug 1993
- 2Stephens & Johnson Operating Co.Sep 1993 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 223654-99 | Recompletion | Taylor Oper. Co. | Oct 25, 1983 | Nov 9, 1983 | — | 6,000 |
| 203020-99 | Recompletion | Taylor Oper. Co. | Jul 27, 1983 | Jul 27, 1983 | — | 6,000 |
| 148213-99 | Drill | Taylor Oper. Co. | Jan 22, 1982 | Jan 22, 1982 | — | 6,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-13-114591 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 915 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,371 | 5,474 | Perforated |
| 5,357 | 5,380 | Perforated |
| 5,357 | 5,711 | Perforated |
| 5,391 | 5,395 | Perforated |
| 5,447 | 5,449 | Perforated |
| 5,456 | 5,457 | Perforated |
| 5,471 | 5,474 | Perforated |
| 5,675 | 5,684 | Perforated |
| 5,675 | 5,711 | Perforated |
| 5,688 | 5,694 | Perforated |
| 5,707 | 5,711 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 261 | 12.25 | 330 S |
| 2.375 | 5,735 | — | — |
| 4.5 | 5,812 | 7.875 | 195 S |
| 2.375 | — | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 6, 1985 | Jan 15, 1985 | — |
| 00 | Feb 1, 1985 | Jan 9, 1985 | — |
| 00 | Feb 10, 1984 | Nov 22, 1983 | — |
| 00 | Jan 25, 1984 | Nov 22, 1983 | — |
| 00 | Jan 12, 1984 | Aug 18, 1983 | — |
| 00 | Jan 12, 1984 | Jul 14, 1982 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-497-32342 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-497-32342 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/49732342, documented in the API reference.