WELL · 42-497-32991 · DISTRICT 9

Halman-Smith -A- #2

N

Wise County · Chico West (Caddo Congl. Upper) field  · Directional

Halman-Smith -A- #2 (API 42-497-32991) is a well in Wise County operated by Oxy USA Inc., completed January 31, 1989.

The RRC has issued 2 drilling permits between 1985 and 1989, permitted to 6,040 ft.

Completion filings report 4 formation tops, including Caddo, 2nd Conglomerate, 3rd Conglomerate, Marble Falls.

Its 3 leases have reported 306 barrels of oil and 415K mcf of gas since January 1993, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

OXY USA Inc.

Houston, TX · P-5 Y, filed Dec 4, 2025 · 3,316 permits on file · (713) 215-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleOXY USA Inc.
Production reportsLarge Operating LLCthrough Apr 2026
Latest permitOXY USA Inc.Sep 28, 1989

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,040
total depth, ft
2
permits on file
Sep 28, 1989
last permit issued
Jan 31, 1989
completed
306
cumulative oil, bbl
415K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 31, 1989
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Halman-Smith "A" G-13-146909Chico, West (Caddo Congl. Upper)Large Operating LLC10365KSep 1993 – Jul 2026
Halman-Smith -A- O-13-25128Chico, West (Caddo Congl. Upper)OXY USA Inc.230650.2KJan 1993 – Jan 1995
— G-13-118314——000—

Gas, mcf lease total

Last 12 months 1,920 · prior 12 2,124(-10%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1OXY USA Inc.Jan 1993 → Dec 1997
  2. 2JW Energy Co., LtdJan 1998 → Nov 2000
  3. 3WG Operating, Inc.Dec 2000 → Nov 2010
  4. 4Milagro Exploration, LLCDec 2010 → Oct 2015
  5. 5White Oak Operating Company LLCNov 2015 → Oct 2018
  6. 6Big Mountain Operating LLCNov 2018 → Jul 2020
  7. 7Everest Energy LLCAug 2020 → May 2021
  8. 8Large Operating LLCJun 2021 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
364393-99RecompletionOXY USA Inc.Sep 26, 1989Sep 28, 1989—6,040
271149-99DrillCities Service Oil & Gas Corp.Jun 13, 1985Apr 1, 1985—5,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-13-118314————
—— G-13-146909————
—— O-13-25128————

Formation tops

As filed on W-2/G-1. Subsea from 906 ft elevation.Download CSV →

FormationMD ftSubsea
Caddo5,185-4,279
2ND Conglomerate5,456-4,550
Caddo5,460-4,554
3RD Conglomerate5,848-4,942
Marble Falls5,926-5,020

Perforations

Perforated and open-hole intervals.

FromToType
5,4605,614Perforated
5,8525,866Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62541212.25300 S
5.56,0207.875550 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 14, 1993Oct 14, 1993—
00Oct 28, 1993——
00Apr 16, 1990Sep 26, 1989Yes
00Mar 23, 1990——
00Dec 5, 1985Sep 30, 1985—
00Dec 4, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49732991, documented in the API reference.