WELL · 42-497-33589 · DISTRICT 9

Crawford H. P. #6

Plugged

Wise County · Risch East (Caddo Congl.) field  · Vertical

Crawford H. P. #6 (API 42-497-33589) is a plugged well in Wise County, plugged December 30, 1998, last operated by Republic Energy Inc..

The RRC has issued 2 drilling permits (amended once) between 1990 and 1994, permitted to 5,800 ft.

It was permitted by Waggoner-Baldridge Oper. CO, Inc and has since transferred to Republic Energy Inc. on the wellbore schedule.

Completion filings report 2 formation tops, including Caddo, Atoka.

Its 2 leases have reported 32.7K barrels of oil and 133K mcf of gas since January 1993, last reporting in September 2015. The leases carry 4 wells, so these are lease totals, not this well alone.

Operator of record

Republic Energy Inc.

Permitted by Waggoner-Baldridge Oper. Co, Inc; the EWA schedule now lists a different operator.

Decatur, TX · P-5 Y, filed Jan 6, 2017 · 238 permits on file · (877) 854-0804

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRepublic Energy Inc.
Production reportsRepublic Energy Inc.through Aug 2012
Latest permitWaggoner-Baldridge Oper. Co, IncAug 2, 1994

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,800
total depth, ft
3
permits on file
Aug 2, 1994
last permit issued
Feb 7, 1991
completed
32.7K
cumulative oil, bbl
133K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 2015

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 7, 1991
Shut in
—
Plugged
Dec 30, 1998

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Crawford, H. P. O-13-27811Risch, East (Caddo Congl.)Republic Energy Inc.326K101KJan 1993 – Sep 2015
Crawford, H.P. "A" O-13-28821Risch, East (Atoka Congl.)Republic Energy Inc.16.71K32.6KJul 1994 – Feb 1999

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Waggoner-Baldridge Oper. Co, IncJan 1993 → May 1996
  2. 2Republic Energy Inc.Jun 1996 → Aug 2012

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
426514-99RecompletionWaggoner-Baldridge Oper. Co, IncAug 1, 1994Aug 2, 1994Dec 26, 19905,600
382634-98DrillWaggoner-Baldridge Oper. Co, IncJan 17, 1991Dec 20, 1990Dec 26, 19905,800
382634-99DrillWaggoner-Baldridge Oper. Co, IncDec 20, 1990Dec 20, 1990—5,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-27811————
—— O-13-28821————

Formation tops

As filed on W-2/G-1. Subsea from 977 ft elevation.Download CSV →

FormationMD ftSubsea
Caddo4,286-3,309
CaddoCADDO CONGL.4,356-3,379
Caddo4,386-3,409
AtokaATOKA MARKER4,970-3,993

Perforations

Perforated and open-hole intervals.

FromToType
4,3584,372Perforated
5,1975,202Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62535012.25200 S
5.55,3207.875105 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 20, 1994Aug 5, 1994—
00Aug 11, 1994——
00Mar 20, 1991Feb 14, 1991Yes
00Feb 26, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49733589, documented in the API reference.