WELL · 42-497-33914 · DISTRICT 9
Ratliff L. D. #3
Wise County · Boonsville (Bend Congl. Gas) field · Vertical
Ratliff L. D. #3 (API 42-497-33914) is a plugged well in Wise County, plugged December 13, 2019, last operated by Richey Ray Management CO. Inc..
The RRC has issued one drilling permit, issued May 17, 1994, permitted to 6,000 ft.
It was permitted by Calto Operating Company, Inc. and has since transferred to Richey Ray Management CO. Inc. on the wellbore schedule.
Completion filings report 3 formation tops, including Pregnant Shale, Caddo, Bend.
Operator of record
Richey Ray Management Co. Inc.
Permitted by Calto Operating Company, Inc.; the EWA schedule now lists a different operator.
Fort Worth, TX · P-5 Y, filed Sep 4, 2025 · 136 permits on file · (800) 800-2908
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Richey Ray Management Co. Inc. |
| Production reports | Richey, Ray Management Co., Inc.through Nov 2007 |
| Latest permit | Calto Operating Company, Inc.May 17, 1994 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,000
- total depth, ft
- 1
- permits on file
- May 17, 1994
- last permit issued
- Jun 16, 1994
- completed
- 0
- cumulative oil, bbl
- 135K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 1994 THROUGH May 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 16, 1994
- Shut in
- —
- Plugged
- Dec 13, 2019
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Ratliff, L. D. G-13-150430 | Boonsville (Bend Congl., Gas) | Richey, Ray Management Co., Inc. | 1 | 0 | 135K | Jun 1994 – May 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Calto Operating Company, Inc.Jul 1994 → Dec 1996
- 2Richey, Ray Management Co., Inc.Jan 1997 → Nov 2007
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 423918-99 | Drill | Calto Operating Company, Inc. | May 13, 1994 | May 17, 1994 | May 25, 1994 | 6,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-13-150430 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 750 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,774 | 5,778 | Perforated |
| 5,789 | 5,793 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 449 | 12.25 | — |
| 4.5 | 5,900 | 7.875 | 255 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 9, 1994 | Jul 14, 1994 | Yes |
| 00 | Aug 12, 1994 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-497-33914 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-497-33914 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/49733914, documented in the API reference.