WELL · 42-497-34525 · DISTRICT 9
Morrison Dean #2
Wise County · Newark East (Barnett Shale) field · Vertical
Morrison Dean #2 (API 42-497-34525) is a well in Wise County operated by Devon Energy Operating CO. L.P., completed October 16, 2000.
The RRC has issued 2 drilling permits between 2000 and 2003, permitted to 7,950 ft.
Completion filings report 4 formation tops, including Strawn, Caddo, Atoka, Barnett.
No lease production has been reported under this well’s leases.
Operator of record
Devon Energy Operating Co. L.P.
Oklahoma City, OK · P-5 Y, filed Oct 8, 2004 · 939 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Devon Energy Operating Co. L.P. |
| Production reports | BKV Barnett, LLCthrough Apr 2026 |
| Latest permit | Devon Energy Operating Co., L.P.May 2, 2003 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,950
- total depth, ft
- 2
- permits on file
- May 2, 2003
- last permit issued
- Oct 16, 2000
- completed
- 0
- cumulative oil, bbl
- 200K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2000 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 16, 2000
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Morrison, Dean G-13-198984 | Boonsville (Bend Congl., Gas) | BKV Barnett, LLC | 1 | 0 | 200K | Jul 2003 – Jul 2026 |
| Morrison, Dean G-13-181912 | Newark, East (Barnett Shale) | Devon Energy Operating Co., L.P. | 1 | 0 | 0 | Oct 2000 – Jul 2003 |
Gas, mcf lease total
Last 12 months 2,613 · prior 12 2,715(-4%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Devon Energy Operating Co., L.P.Sep 2003 → Jul 2004
- 2Devon Energy Production Co, L.P.Aug 2004 → Sep 2020
- 3BKV Barnett, LLCOct 2020 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 531434-99 | Recompletion | Devon Energy Operating Co., L.P. | May 2, 2003 | May 2, 2003 | Jul 10, 2003 | 7,950 |
| 494834-99 | Drill | Mitchell Energy Corporation | May 8, 2000 | May 8, 2000 | May 25, 2000 | 7,950 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-13-181912 | — | — | — | — |
| — | — G-13-198984 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 971 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,000 | 6,122 | Perforated |
| 6,933 | 6,975 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 697 | 12.25 | 360 S |
| 5.5 | 7,693 | 7.875 | 595 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 7, 2004 | Dec 15, 2003 | Yes |
| 00 | Feb 9, 2004 | — | — |
| 00 | Jun 13, 2001 | Apr 10, 2001 | Yes |
| 00 | Apr 25, 2001 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-497-34525 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-497-34525 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/49734525, documented in the API reference.