WELL · 42-497-35044 · DISTRICT 9
Coleman W. S. #1
Wise County · Newark East (Barnett Shale) field · Vertical
Coleman W. S. #1 (API 42-497-35044) is a plugged well in Wise County, plugged January 5, 2006, last operated by Champion Disposal Holdings LLC.
The RRC has issued one drilling permit, issued July 31, 2002, permitted to 2,250 ft.
It was permitted by Bridgeport Tank Trucks, Inc. and has since transferred to Champion Disposal Holdings LLC on the wellbore schedule.
Completion filings report one formation top, including Brackenridge Line.
Operator of record
Champion Disposal Holdings LLC
Permitted by Bridgeport Tank Trucks, Inc.; the EWA schedule now lists a different operator.
Bridgeport, TX · P-5 Y, filed Nov 4, 2025 · (940) 577-9381
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Champion Disposal Holdings LLC |
| Production reports | none |
| Latest permit | Bridgeport Tank Trucks, Inc.Jul 31, 2002 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,250
- total depth, ft
- 1
- permits on file
- Jul 31, 2002
- last permit issued
- Aug 22, 2002
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 2002 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 22, 2002
- Shut in
- —
- Plugged
- Jan 5, 2006
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Coleman, W. S. O-13-30073 | Newark, East (Barnett Shale) | Champion Disposal Holdings, LLC | 2 | 0 | 0 | Sep 2002 – Jul 2026 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 522378-99 | Drill | Bridgeport Tank Trucks, Inc. | Jul 31, 2002 | Jul 31, 2002 | Aug 5, 2002 | 2,250 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-30073 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,134 | 2,160 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 360 | 12.25 | 190 S |
| 7 | 2,216 | 8.75 | 360 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 6, 2003 | Aug 30, 2002 | Yes |
| 00 | Nov 5, 2002 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-497-35044 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-497-35044 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 417K
- bbl, last 12 reported months
- 1.76M
- bbl, all reported
- Sep 2005
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000092607 | W-14 Disposal | Plugged Jan 19, 2006 | 4,500 | 840 | 1,686–1,748 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 417,294 · prior 12 588,023(-29%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/49735044, documented in the API reference.