WELL · 42-497-35503 · DISTRICT 9

LBJ Grasslands 96 #1

Plugged

Wise County · Newark East (Barnett Shale) field  · Vertical

Lbj Grasslands 96 #1 (API 42-497-35503) is a plugged well in Wise County, plugged January 30, 2009, last operated by Texakoma Operating L.P..

The RRC has issued one drilling permit, issued January 13, 2004, permitted to 8,700 ft.

It was permitted by Texakoma Oil & Gas Corporation and has since transferred to Texakoma Operating L.P. on the wellbore schedule.

Completion filings report 3 formation tops, including Caddo, Marble Falls, Barnett.

Its 2 leases have reported 517 barrels of oil and 25.7K mcf of gas since October 2004, last reporting in January 2009. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Texakoma Operating L.P.

Permitted by Texakoma Oil & Gas Corporation; the EWA schedule now lists a different operator.

Plano, TX · P-5 Y, filed Jun 4, 2025 · 68 permits on file · (214) 205-8393

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTexakoma Operating L.P.
Production reportsTexakoma Operating, L.P.through Nov 2006
Latest permitTexakoma Oil & Gas CorporationJan 13, 2004

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,700
total depth, ft
1
permits on file
Jan 13, 2004
last permit issued
Oct 28, 2004
completed
517
cumulative oil, bbl
25.7K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2004 THROUGH Jan 2009

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 28, 2004
Shut in
—
Plugged
Jan 30, 2009

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
LBJ Grasslands 96 G-13-219790Newark, East (Barnett Shale)Texakoma Operating, L.P.1059Sep 2006 – Jan 2009
LBJ Grasslands 96 O-13-30373Newark, East (Barnett Shale)Texakoma Operating, L.P.151725.7KOct 2004 – Dec 2006

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texakoma Oil & Gas CorporationOct 2004 → Nov 2004
  2. 2Texakoma E & P, LLCDec 2004 → Aug 2005
  3. 3Texakoma Operating, L.P.Sep 2005 → Nov 2006

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
540649-99DrillTexakoma Oil & Gas CorporationJan 12, 2004Jan 13, 2004Jul 22, 20048,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-13-219790————
—— O-13-30373————

Formation tops

As filed on W-2/G-1. Subsea from 895 ft elevation.Download CSV →

FormationMD ftSubsea
CaddoCADDO LIME6,369-5,474
Marble Falls7,090-6,195
BarnettBARNETT SHALE7,698-6,803
Marble Falls17,090-16,195

Perforations

Perforated and open-hole intervals.

FromToType
7,7107,730Perforated
7,8288,156Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62567412.25630 S
5.58,2087.875425 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 22, 2007Sep 22, 2006—
00Oct 4, 2006——
00Jan 18, 2005Nov 5, 2004Yes
00Nov 17, 2004——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49735503, documented in the API reference.