WELL · 42-497-35525 · DISTRICT 9

Stephens Gerald #3

N

Wise County · Newark East (Barnett Shale) field  · Vertical

Stephens Gerald #3 (API 42-497-35525) is a well in Wise County operated by Atlas Operating LLC, completed April 10, 2004.

The RRC has issued 2 drilling permits between 2004 and 2013, permitted to 8,900 ft.

Completion filings report 5 formation tops, including Strawn, Caddo, Atoka, Marble Falls.

Its 2 leases have reported 591 barrels of oil and 95.1K mcf of gas since November 2004, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Atlas Operating LLC

Houston, TX · P-5 Y, filed Oct 4, 2025 · 78 permits on file · (281) 893-9400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAtlas Operating LLC
Production reportsAtlas Operating LLCthrough Mar 2026
Latest permitAtlas Operating LLCDec 4, 2013
8,900
total depth, ft
2
permits on file
Dec 4, 2013
last permit issued
Apr 10, 2004
completed
591
cumulative oil, bbl
95.1K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2004 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 10, 2004
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Gerald Stephens G-13-274422Boonsville (Bend Congl., Gas)Atlas Operating LLC1016.7KApr 2014 – Jul 2026
Stephens, Gerald O-13-30388Newark, East (Barnett Shale)Atlas Operating LLC159178.4KNov 2004 – Jul 2026

Gas, mcf lease total

Last 12 months 1,110 · prior 12 1,257(-12%)

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Pioneer Exploration, Ltd.Nov 2004 → Jun 2007
  2. 2Pioneer Exploration, LLCSep 2008 → Mar 2010
  3. 3Atlas Operating LLCApr 2010 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
765448-99RecompletionAtlas Operating LLCJun 25, 2013Dec 4, 2013Jan 25, 20068,314
541427-99DrillPioneer Exploration, Ltd.Jan 30, 2004Feb 2, 2004—8,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-13-274422————
—— O-13-30388————

Formation tops

As filed on W-2/G-1. Subsea from 874 ft elevation.Download CSV →

FormationMD ftSubsea
Strawn5,775-4,901
StrawnSTRAWN SANDS5,775-4,901
Caddo6,316-5,442
CaddoCADDO LIME6,316-5,442
Atoka6,619-5,745
AtokaATOKA CONGL.6,699-5,825
Marble FallsMARBLE FALLS LIME7,293-6,419
BarnettUPPER BARNETT SAND7,475-6,601
BarnettLOWER BARNETT SAND7,880-7,006

Perforations

Perforated and open-hole intervals.

FromToType
6,5226,532Open hole
6,6226,626Open hole
6,6416,645Open hole
6,6946,700Open hole
6,7366,740Open hole
7,8807,900Perforated
8,0168,036Perforated
8,0388,058Perforated
8,1088,128Perforated
8,1448,164Perforated
8,2148,234Perforated
8,2448,264Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62569012.25375 S
5.58,2747.875430 S
5.58,2757.875430 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 5, 2014Apr 23, 2014—
00Mar 24, 2005Dec 20, 2004Yes
00Jan 12, 2005——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49735525, documented in the API reference.