WELL · 42-497-35780 · DISTRICT 9
Holt Patty Jane #1
Wise County · Newark East (Barnett Shale) field · Temp Abandoned · Vertical
Holt Patty Jane #1 (API 42-497-35780) is a well in Wise County operated by Eagleridge Operating LLC, completed June 6, 2005 and listed as temp abandoned on the RRC schedule.
The RRC has issued one drilling permit, issued February 4, 2005, permitted to 8,000 ft.
It was permitted by Van Operating, Ltd. and has since transferred to Eagleridge Operating LLC on the wellbore schedule.
Completion filings report 3 formation tops, including T/Upper Barnett, T/Forestburg, T/Lower Barnett.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Van Operating, Ltd.; the EWA schedule now lists a different operator.
Dallas, TX · P-5 X, filed Apr 8, 2026 · 129 permits on file · (214) 295-6704
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Eagleridge Operating LLC |
| Production reports | Eagleridge Operating, LLCthrough Sep 2022 |
| Latest permit | Van Operating, Ltd.Feb 4, 2005 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,000
- total depth, ft
- 1
- permits on file
- Feb 4, 2005
- last permit issued
- Jun 6, 2005
- completed
- 0
- cumulative oil, bbl
- 902K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 2005 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jun 6, 2005
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Holt, Patty Jane G-13-209557 | Newark, East (Barnett Shale) | Eagleridge Operating, LLC | 1 | 0 | 902K | Jun 2005 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Van Operating, Ltd.Jun 2005 → Aug 2006
- 2Williams Prod. Gulf Coast, L.P.Sep 2006 → Jan 2012
- 3WPX Energy Gulf Coast, LPFeb 2012 → May 2012
- 4Premier Natural Resources Ii,llcJun 2012 → Feb 2015
- 5Trinity River Energy Oper, LLCMar 2015 → Jun 2017
- 6Eagleridge Operating, LLCJul 2017 → Sep 2022
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 557160-99 | Drill | Van Operating, Ltd. | Feb 2, 2005 | Feb 4, 2005 | — | 8,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-13-209557 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 926 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| T/Upper Barnett | 7,098 | -6,172 |
| T/Forestburg | 7,230 | -6,304 |
| T/Lower Barnett | 7,425 | -6,499 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,435 | 7,546 | Perforated |
| 7,457 | 7,572 | Perforated |
| 7,488 | 7,623 | Perforated |
| 7,524 | 7,667 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 798 | 12.25 | 395 S |
| 5.5 | 7,748 | 7.875 | 225 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 29, 2005 | Jun 13, 2005 | Yes |
| 00 | Jul 21, 2005 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-497-35780 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-497-35780 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/49735780, documented in the API reference.