WELL · 42-499-00518 · DISTRICT 6
Hague Rosa et al Unit #1
Wood County · Manziel SE. (Gloyd) field · Vertical
Hague Rosa ET AL Unit #1 (API 42-499-00518) is a well in Wood County operated by Southwest Operating Inc.-Tyler, completed November 4, 1992.
The RRC has issued 2 drilling permits between 1990 and 1993, permitted to 8,850 ft.
It was permitted by Goldsmith, J. Paul and has since transferred to Southwest Operating Inc.-Tyler on the wellbore schedule.
Completion filings report 7 formation tops, including Austin Chalk, Sub-Clarksville, Paluxy, Base Mass Hydrite.
Its 3 leases have reported 83 barrels of oil and 7.08K mcf of gas since January 1993, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Southwest Operating Inc.-Tyler
Permitted by Goldsmith, J. Paul; the EWA schedule now lists a different operator.
Tyler, TX · P-5 Y, filed Feb 4, 2026 · 63 permits on file · (903) 530-1563
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Southwest Operating Inc.-Tyler |
| Production reports | Southwest Operating, Inc.-Tylerthrough Nov 2001 |
| Latest permit | Goldsmith, J. PaulMar 8, 1993 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,850
- total depth, ft
- 2
- permits on file
- Mar 8, 1993
- last permit issued
- Nov 4, 1992
- completed
- 83
- cumulative oil, bbl
- 7.08K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 4, 1992
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hague, Rosa et al Unit G-6-155794 | Manziel, SE. (Rodessa V) | Southwest Operating, Inc.-Tyler | 1 | 0 | 7.06K | May 1995 – Jul 2026 |
| Hague, Rosa et al Unit O-6-12701 | Manziel, SE. (Gloyd) | Southwest Operating, Inc.-Tyler | 1 | 83 | 22 | Jan 1993 – Apr 1996 |
| — O-6-850 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Goldsmith, J. PaulApr 1993 → Sep 1993
- 2Southwest Operating, Inc.-TylerMay 1995 → Nov 2001
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 409646-99 | Recompletion | Goldsmith, J. Paul | Mar 8, 1993 | Mar 8, 1993 | Nov 3, 1992 | 8,850 |
| 371698-99 | Recompletion | Fair Oil Company | Apr 2, 1990 | Apr 9, 1990 | — | 8,440 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-155794 | — | — | — | — |
| — | — O-6-850 | — | — | — | — |
| — | — O-6-12701 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 464 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Austin ChalkBASE AUSTIN CHALK | 4,110 | -3,646 |
| Sub-ClarksvilleSUB CLARKSVILLE | 4,120 | -3,656 |
| Sub-Clarksville | 4,120 | -3,656 |
| Sub-ClarksvilleTOP SUB CLARKSVILLE | 4,120 | -3,656 |
| Paluxy | 6,280 | -5,816 |
| PaluxyTOP PALUXY | 6,280 | -5,816 |
| Base Mass Hydrite | 8,060 | -7,596 |
| Massive Anhydrite (marker)BASE MASSIVE ANHYDRITE | 8,060 | -7,596 |
| Gloyd | 8,350 | -7,886 |
| Top Gloyd | 8,350 | -7,886 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,218 | 8,224 | Perforated |
| 8,235 | 8,238 | Perforated |
| 8,364 | 8,412 | Perforated |
| — | 8,754 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 777 | 13.375 | 275 S |
| 7.625 | 6,440 | 9.875 | 225 S |
| 5.5 | 8,730 | 6.75 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 10, 1996 | Jun 15, 1995 | — |
| 00 | Nov 6, 1995 | — | — |
| 00 | Jun 3, 1994 | Jan 24, 1994 | Yes |
| 00 | Aug 7, 1990 | Mar 30, 1990 | Yes |
| 00 | Jul 25, 1990 | — | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-499-00518 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-499-00518 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/49900518, documented in the API reference.