WELL · 42-499-00968 · DISTRICT 6

Merigale-Paul Waterflood Unit #3 #1

Plugged

Wood County · Merigale-Paul field  · Vertical

Merigale-Paul Waterflood Unit #3 #1 (API 42-499-00968) is a plugged well in Wood County, plugged March 12, 2021, last operated by Covenant Energy LLC.

The RRC has issued one drilling permit, issued December 8, 1983, permitted to 4,980 ft.

It was permitted by Quitman Construction CO., Inc. and has since transferred to Covenant Energy LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Pecan Gap, Taylor, Austin Chalk, Eagle Ford.

Its lease has reported 7.52K barrels of oil and 16 mcf of gas since January 1993, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Covenant Energy LLC

Permitted by Quitman Construction Co., Inc.; the EWA schedule now lists a different operator.

Gilmer, TX · P-5 Y, filed Feb 25, 2026 · (940) 337-6917

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCovenant Energy LLC
Production reportsVogo, Inc.through Jan 2015
Latest permitQuitman Construction Co., Inc.Dec 8, 1983

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,980
total depth, ft
1
permits on file
Dec 8, 1983
last permit issued
—
completed
7.52K
cumulative oil, bbl
16
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Mar 12, 2021

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sparham, D. A. O-6-914Merigale-PaulVogo, Inc.27.52K16Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Quitman Construction Co., Inc.Jan 1993 → Mar 2011
  2. 2Vogo, Inc.Feb 2013 → Jan 2015

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
223178-99OtherQuitman Construction Co., Inc.Dec 8, 1983Dec 8, 1983—4,980

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-6-914————

Formation tops

As filed on W-2/G-1. Subsea from 485 ft elevation.Download CSV →

FormationMD ftSubsea
Pecan GapPECAN GAP CHALK3,185-2,700
TaylorTAYLOR SHALE3,350-2,865
Austin Chalk4,540-4,055
Eagle Ford4,800-4,315
Sub-Clarksville4,900-4,415

Perforations

Perforated and open-hole intervals.

FromToType
4,9004,932Perforated
—4,800Perforated
—4,872Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62536512.25—
5.54,9758.75—

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 17, 2010Jul 29, 2009—
00Oct 29, 1984Jul 13, 1984—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
3.5M
bbl, all reported
Aug 2009
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000052262H-1 InjectionPlugged Mar 19, 20212,5001,5004,900–4,932

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 44,782(-100%)

05K10K15K20082009

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49900968, documented in the API reference.