WELL · 42-499-30784 · DISTRICT 6
Holly Lake Ranch #1
Wood County · Pine Mills E. (Sub-Clarksville) field · Vertical
Holly Lake Ranch #1 (API 42-499-30784) is a plugged well in Wood County, plugged January 31, 1995, last operated by Royal Exploration & Drilling.
The RRC has issued one drilling permit, issued March 5, 1980, permitted to 5,000 ft.
It was permitted by Sabine Exploration and has since transferred to Royal Exploration & Drilling on the wellbore schedule.
Operator of record
Permitted by Sabine Exploration; the EWA schedule now lists a different operator.
Dallas, TX · P-5 Y, filed Feb 3, 1995 · 1 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Royal Exploration & Drilling |
| Production reports | none |
| Latest permit | Sabine ExplorationMar 5, 1980 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,000
- total depth, ft
- 1
- permits on file
- Mar 5, 1980
- last permit issued
- Feb 5, 1981
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 1995
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 5, 1981
- Shut in
- —
- Plugged
- Jan 31, 1995
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Holly Lake Ranch O-6-10404 | Pine Mills, E. (Sub-Clarksville) | Royal Exploration & Drilling | 1 | 0 | 0 | Jan 1993 – Aug 1995 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 74591-99 | Drill | Sabine Exploration | Mar 5, 1980 | Mar 5, 1980 | Mar 6, 1980 | 5,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-6-10404 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,750 | 4,756 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 806 | 11.75 | 425 S |
| 2.375 | 4,720 | — | — |
| 4.5 | 4,826 | 7.875 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Mar 12, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-499-30784 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-499-30784 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/49930784, documented in the API reference.