WELL · 42-499-30945 · DISTRICT 6
Vance H.A. #1D
Wood County · Shirley-Barbara E. (Woodbine) field · Vertical
Vance H.A. #1D (API 42-499-30945) is a plugged well in Wood County, plugged April 7, 1982, last operated by Noble & Cantrell Exploration CO..
The RRC has issued 2 drilling permits between 1981 and 1983, permitted to 6,831 ft.
Completion filings report 4 formation tops, including Pecan Gap, Austin Chalk, Sub-Clarksville, Woodbine.
Operator of record
Noble & Cantrell Exploration Co.
Winnsboro, TX · P-5 Y, filed Jun 15, 1987 · 36 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Noble & Cantrell Exploration Co. |
| Production reports | none |
| Latest permit | Noble & Cantrell Exploration Co.Sep 19, 1983 |
- 6,831
- total depth, ft
- 2
- permits on file
- Sep 19, 1983
- last permit issued
- May 10, 1981
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 10, 1981
- Shut in
- —
- Plugged
- Apr 7, 1982
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Vance, H. A. O-6-11936 | Shirley-Barbara, E. (Woodbine) | Don-Dale, Inc. | 1 | 0 | 0 | Jan 1993 – Aug 2003 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 213363-99 | Other | Noble & Cantrell Exploration Co. | Sep 19, 1983 | Sep 19, 1983 | Sep 20, 1983 | 6,831 |
| 110690-99 | Drill | Noble & Cantrell Exploration Co. | Mar 4, 1981 | Mar 4, 1981 | Mar 9, 1981 | 6,360 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-6-11936 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 505 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Pecan Gap | 3,200 | -2,695 |
| Austin Chalk | 5,050 | -4,545 |
| Sub-Clarksville | 5,470 | -4,965 |
| Woodbine | 6,072 | -5,567 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,350 | 6,350 | Perforated |
| 6,350 | 6,360 | Perforated |
| 6,693 | 6,800 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 300 | 12.25 | 150 S |
| 2.875 | 6,250 | — | — |
| 5.5 | 6,650 | 7.875 | 525 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 16, 1988 | Mar 25, 1988 | — |
| 00 | May 1, 1986 | Feb 27, 1986 | — |
| 00 | Apr 23, 1986 | — | — |
| 00 | Jan 12, 1984 | Nov 9, 1981 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-499-30945 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-499-30945 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 308K
- bbl, all reported
- Mar 1994
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000060200 | W-14 Disposal | Plugged Jun 11, 1993 | 1,000 | 1,200 | 6,650–6,801 |
MONTHLY INJECTED, BBL · H-10 · LAST 13 REPORTED MONTHS
Last 12 months 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/49930945, documented in the API reference.