WELL · 42-499-31334 · DISTRICT 6
Holland V. C. Etal #1A
Wood County · Gamblin North (Smackover) field · Vertical
Holland V. C. Etal #1A (API 42-499-31334) is a plugged well in Wood County, plugged June 16, 1995, last operated by Dallas Production Inc..
The RRC has issued one drilling permit, issued January 31, 1985, permitted to 14,000 ft.
It was permitted by Trend Resources Limited and has since transferred to Dallas Production Inc. on the wellbore schedule.
Completion filings report 6 formation tops, including Buda, Rodessa, Travis Peak, Lcvl.
Operator of record
Permitted by Trend Resources Limited; the EWA schedule now lists a different operator.
Dallas, TX · P-5 Y, filed Dec 4, 2020 · 823 permits on file · (214) 265-4319
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Dallas Production Inc. |
| Production reports | Dallas Production, Inc.through Mar 1995 |
| Latest permit | Trend Resources LimitedJan 31, 1985 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 14,000
- total depth, ft
- 1
- permits on file
- Jan 31, 1985
- last permit issued
- May 13, 1985
- completed
- 0
- cumulative oil, bbl
- 57.3K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 1995
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 13, 1985
- Shut in
- —
- Plugged
- Jun 16, 1995
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Holland, V. C. Etal G-6-119117 | Gamblin, North (Smackover) | Dallas Production, Inc. | 1 | 0 | 57.3K | Jan 1993 – Jun 1995 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Dallas Production, Inc.Jan 1993 → Mar 1995
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 265668-99 | Drill | Trend Resources Limited | Jan 31, 1985 | Jan 31, 1985 | Feb 20, 1985 | 14,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-119117 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 470 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Buda | 5,200 | -4,730 |
| Rodessa | 7,811 | -7,341 |
| Travis Peak | 8,548 | -8,078 |
| Lcvl | 11,915 | -11,445 |
| Buckner | 12,540 | -12,070 |
| SmackoverUPPER SMACKOVER | 13,133 | -12,663 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 13,260 | 13,276 | Perforated |
| 13,280 | 13,294 | Perforated |
| 13,298 | 13,320 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 24 | 40 | 30 | — |
| 16 | 544 | 20 | 800 S |
| 10.75 | 5,784 | 14.75 | 3,100 S |
| 7 | 13,683 | 9.875 | 900 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 17, 1985 | Jun 27, 1985 | — |
| 00 | Dec 11, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-499-31334 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-499-31334 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/49931334, documented in the API reference.