WELL · 42-499-31903 · DISTRICT 6

Goldsmith, J. B. #51

N

Wood County  · Vertical

Goldsmith, J. B. #51 (API 42-499-31903) is a former disposal or injection well in Wood County, last operated by Gaither Petroleum Corporation; its UIC permit is no longer active.

The RRC has issued 2 drilling permits (amended once) between 1998 and 2003, permitted to 6,500 ft.

Completion filings report 3 formation tops, including Pecan Gap, Sub-Clarksville, Woodbine.

Its lease has reported 922K barrels of oil and 303K mcf of gas since January 1993, last reporting in July 2026. The lease carries 19 wells, so these are lease totals, not this well alone.

Operator of record

Gaither Petroleum Corporation

Katy, TX · P-5 Y, filed Nov 4, 2025 · 117 permits on file · (281) 830-7878

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsAtlas Operating LLCthrough Mar 2026
Latest permitGaither Petroleum CorporationApr 30, 2003
6,500
total depth, ft
3
permits on file
Apr 30, 2003
last permit issued
—
completed
922K
cumulative oil, bbl
303K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 19 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Goldsmith, J. B. O-6-1358QuitmanAtlas Operating LLC19922K303KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 2,821 · prior 12 1,837(+54%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Shell Western E&P Inc.Jan 1993 → Apr 1993
  2. 2Cross Timbers Operating CompanyMay 1993 → May 1997
  3. 3J-O'B Operating CompanyJun 1997 → Oct 2001
  4. 4Gaither Petroleum CorporationNov 2001 → Aug 2004
  5. 5Pioneer Exploration, Ltd.Sep 2004 → Jan 2008
  6. 6Pioneer Exploration, LLCFeb 2008 → Mar 2010
  7. 7Atlas Operating LLCApr 2010 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
531324-99ReenterGaither Petroleum CorporationApr 30, 2003Apr 30, 2003—6,500
479347-98DrillJ-O'B Operating CompanyMar 24, 2000Sep 10, 1998Feb 4, 20006,500
479347-99DrillJ-O'B Operating CompanySep 10, 1998Sep 10, 1998—6,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-6-1358————

Formation tops

As filed on W-2/G-1. Subsea from 448 ft elevation.Download CSV →

FormationMD ftSubsea
Pecan Gap2,500-2,052
Sub-Clarksville4,042-3,594
Woodbine4,474-4,026

Perforations

Perforated and open-hole intervals.

FromToType
4,8054,845Perforated
4,8604,980Perforated
4,9955,034Perforated
5,0505,175Perforated
6,3236,329Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62577511207 S
5.56,4927.8751,300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 7, 2014Dec 20, 2013—
00May 25, 2000Mar 13, 2000Yes
00May 3, 2000——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

262K
bbl, last 12 reported months
1.59M
bbl, all reported
Aug 2024
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000094611H-1 InjectionPlugged Feb 14, 20252,0002,2704,560–5,175

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 261,950 · prior 12 276,402(-5%)

020K40K60K20232024

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49931903, documented in the API reference.