WELL · 42-499-31998 · DISTRICT 6

Shamburger J.G. #4A

Y

Wood County · Manziel (Sub-Clarksville) field · Producing  · Vertical

Shamburger J.G. #4A (API 42-499-31998) is a well in Wood County operated by Southwest Operating Inc.-Tyler, completed July 14, 2003 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued May 22, 2003, permitted to 4,500 ft.

It was permitted by Noble & Cantrell Expl. CO., Inc. and has since transferred to Southwest Operating Inc.-Tyler on the wellbore schedule.

Completion filings report 3 formation tops, including Nacotoch, Pecan Gap, Sub-Clarksville.

Its lease has reported 107K barrels of oil and 26 mcf of gas since January 1993, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Southwest Operating Inc.-Tyler

Permitted by Noble & Cantrell Expl. Co., Inc.; the EWA schedule now lists a different operator.

Tyler, TX · P-5 Y, filed Feb 4, 2026 · 63 permits on file · (903) 530-1563

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSouthwest Operating Inc.-Tyler
Production reportsSouthwest Operating, Inc.-Tylerthrough Apr 2026
Latest permitNoble & Cantrell Expl. Co., Inc.May 22, 2003

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,500
total depth, ft
1
permits on file
May 22, 2003
last permit issued
Jul 14, 2003
completed
107K
cumulative oil, bbl
26
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 14, 2003
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Shamburger, J.G. O-6-13103Manziel (Sub-Clarksville)Southwest Operating, Inc.-Tyler2107K26Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 2,006 · prior 12 2,490(-19%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Ncec, Inc.Jan 1993 → May 1994
  2. 2Noble & Cantrell Expl. Co., Inc.Jun 1994 → Jul 2006
  3. 35-N EnergyAug 2006 → Aug 2006
  4. 4Shiloh Operating LLCSep 2006 → Sep 2007
  5. 5Southwest Operating, Inc.-TylerOct 2007 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
532019-99DrillNoble & Cantrell Expl. Co., Inc.May 16, 2003May 22, 2003Jun 25, 20034,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-6-13103————

Formation tops

As filed on W-2/G-1. Subsea from 465 ft elevation.Download CSV →

FormationMD ftSubsea
Nacotoch1,700-1,235
Pecan Gap2,566-2,101
Sub-Clarksville4,060-3,595

Perforations

Perforated and open-hole intervals.

FromToType
4,0614,082Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62582111257 S
5.54,4707.875270 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 25, 2003Aug 13, 2003Yes
00Sep 18, 2003——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49931998, documented in the API reference.