WELL · 42-499-32058 · DISTRICT 6
Russell #1
Wood County · Quitman field · Vertical
Russell #1 (API 42-499-32058) is a plugged well in Wood County, plugged December 7, 2007, last operated by J-O B Operating Company.
The RRC has issued one drilling permit, issued May 25, 2006, permitted to 6,600 ft.
Completion filings report one formation top, including Paluxy.
Its lease has reported 812 barrels of oil since July 2006, last reporting in August 2008.
Operator of record
Shreveport, LA · P-5 Y, filed Mar 4, 2026 · 113 permits on file · (318) 455-7440
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | J-O B Operating Company |
| Production reports | J-O'B Operating Companythrough Mar 2007 |
| Latest permit | J-O'B Operating CompanyMay 25, 2006 |
- 6,600
- total depth, ft
- 1
- permits on file
- May 25, 2006
- last permit issued
- Jul 26, 2006
- completed
- 812
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2006 THROUGH Aug 2008
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 26, 2006
- Shut in
- —
- Plugged
- Dec 7, 2007
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Russell O-6-14547 | Quitman | J-O'B Operating Company | 1 | 812 | 0 | Jul 2006 – Aug 2008 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1J-O'B Operating CompanyAug 2006 → Mar 2007
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 619914-99 | Drill | J-O'B Operating Company | May 25, 2006 | May 25, 2006 | Jun 22, 2006 | 6,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-6-14547 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 435 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Paluxy | 6,373 | -5,938 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,373 | 6,386 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 857 | 11 | 300 S |
| 5.5 | 6,556 | 7.875 | 800 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 28, 2007 | Sep 21, 2006 | Yes |
| 00 | Oct 26, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-499-32058 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-499-32058 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/49932058, documented in the API reference.