WELL · 42-499-32109 · DISTRICT 6

Goldsmith #7

Plugged

Wood County · Quitman (Sub-Clarksville) field  · Vertical

Goldsmith #7 (API 42-499-32109) is a plugged well in Wood County, plugged August 19, 2013, last operated by Southwest Operating Inc.-Tyler.

The RRC has issued one drilling permit, issued July 15, 2011, permitted to 4,800 ft.

Completion filings report 4 formation tops, including Nacotiche, Pecan Gap, Austin Chalk, Sub-Clarksville.

Operator of record

Southwest Operating Inc.-Tyler

Tyler, TX · P-5 Y, filed Feb 4, 2026 · 63 permits on file · (903) 530-1563

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSouthwest Operating Inc.-Tyler
Production reportsnone
Latest permitSouthwest Operating, Inc.-TylerJul 15, 2011
4,800
total depth, ft
1
permits on file
Jul 15, 2011
last permit issued
Sep 28, 2011
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 2011 THROUGH Dec 2013

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 28, 2011
Shut in
—
Plugged
Aug 19, 2013

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Goldsmith O-6-15151Quitman (Sub-Clarksville)Southwest Operating, Inc.-Tyler100Sep 2011 – Dec 2013

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
720176-99DrillSouthwest Operating, Inc.-TylerJul 13, 2011Jul 15, 2011Sep 12, 20114,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-6-15151————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Nacotiche1,860
Pecan Gap2,690
Austin ChalkBASE OF AUSTIN CHALK4,180
Sub-ClarksvilleSUB CLARKSVILLE4,185

Perforations

Perforated and open-hole intervals.

FromToType
4,1884,194Perforated
4,2024,204Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62586011250 S
5.54,3357.875354 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 25, 2013May 3, 2012Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49932109, documented in the API reference.