WELL · 42-499-32150 · DISTRICT 6

Taylor Heirs Tpcv #1

Y

Wood County · Neuhoff (TP CV Cons.) field · Producing  · Directional

Taylor Heirs Tpcv #1 (API 42-499-32150) is a well in Wood County operated by Montare Operating Ltd., completed May 30, 2018 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued September 11, 2014, permitted to 12,500 ft.

It was permitted by Energy Production Corporation and has since transferred to Montare Operating Ltd. on the wellbore schedule.

Completion filings report 9 formation tops, including Sub-Clarksville, Paluxy, Glen Rose, Rodessa.

No lease production has been reported under this well’s leases.

Operator of record

Montare Operating Ltd.

Permitted by Energy Production Corporation; the EWA schedule now lists a different operator.

Flower Mound, TX · P-5 Y, filed Mar 4, 2026 · 21 permits on file · (800) 290-0407

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMontare Operating Ltd.
Production reportsMontare Operating, Ltd.through Apr 2026
Latest permitEnergy Production CorporationSep 11, 2014

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,500
total depth, ft
1
permits on file
Sep 11, 2014
last permit issued
May 30, 2018
completed
0
cumulative oil, bbl
5.84M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2015 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 30, 2018
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Taylor Heirs Tpcv G-6-278231Neuhoff (Travis Peak)Montare Operating, Ltd.105.84MApr 2015 – Jul 2026

Gas, mcf lease total

Last 12 months 359,070 · prior 12 368,559(-3%)

020K40K60K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Energy Production CorporationJun 2015 → Oct 2017
  2. 2Blackwell Exp & Development, LLCNov 2017 → Nov 2023
  3. 3Montare Operating, Ltd.Dec 2023 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
794705-99DrillEnergy Production CorporationAug 22, 2014Sep 11, 2014Oct 16, 201412,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-278231————

Formation tops

As filed on W-2/G-1. Subsea from 387 ft elevation.Download CSV →

FormationMD ftSubsea
Sub-Clarksville9,202-8,815
Paluxy9,994-9,607
Glen Rose10,134-9,747
Rodessa11,001-10,614
Travis Peak11,470-11,083
Austin Chalk——
Nacatoch——
Smackover——
Woodbine——

Perforations

Perforated and open-hole intervals.

FromToType
11,99212,146Perforated
12,07612,078Perforated
12,09412,096Perforated
12,12012,122Perforated
12,14212,146Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
2012321.5250 S
1665017.51,660 S
13.3751,30315330 S
9.6259,55012.251,732 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 20, 2019Nov 30, 2018—
00Dec 11, 2015Jun 30, 2015—
00Oct 30, 2015May 1, 2015Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49932150, documented in the API reference.