WELL · 42-501-32116 · DISTRICT 8
Sam 449 #1
Yoakum County · Brahaney field · Shut IN · Vertical
Sam 449 #1 (API 42-501-32116) is a well in Yoakum County operated by Perimeter Resource Company, completed June 23, 1981 and listed as shut in on the RRC schedule.
The RRC has issued one drilling permit, issued June 18, 1981, permitted to 5,400 ft.
It was permitted by Monsanto Company and has since transferred to Perimeter Resource Company on the wellbore schedule.
Its lease has reported 106K barrels of oil and 375 mcf of gas since January 1993, last reporting in July 2026. The lease carries 4 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Monsanto Company; the EWA schedule now lists a different operator.
Midland, TX · P-5 Y, filed Mar 4, 2026 · 2 permits on file · (432) 638-9906
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Perimeter Resource Company |
| Production reports | Perimeter Resource Companythrough Mar 2026 |
| Latest permit | Monsanto CompanyJun 18, 1981 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,400
- total depth, ft
- 1
- permits on file
- Jun 18, 1981
- last permit issued
- Jun 23, 1981
- completed
- 106K
- cumulative oil, bbl
- 375
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jun 23, 1981
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Sam "449" O-11-63238 | Brahaney | Perimeter Resource Company | 4 | 106K | 375 | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 1,645 · prior 12 1,764(-7%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Bledsoe Partners, Inc.Jan 1993 → Feb 1995
- 2Synergex, Inc.Mar 1995 → Dec 1995
- 3Petroplex Equipment, Inc.Jan 1996 → Feb 2019
- 4Perimeter Resource CompanyMay 2019 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 121680-99 | Drill | Monsanto Company | Jun 18, 1981 | Jun 18, 1981 | Jun 3, 1981 | 5,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-11-63238 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,232 | 5,289 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 410 | 12.25 | 450 S |
| 2.375 | 5,290 | — | — |
| 5.5 | 5,298 | 7.875 | 1,050 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Jul 1, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-501-32116 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-501-32116 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50132116, documented in the API reference.