WELL · 42-501-32794 · DISTRICT 11

Milestone #1

Plugged

Yoakum County  · Vertical

Milestone #1 (API 42-501-32794) is a plugged well in Yoakum County, plugged January 25, 2018, last operated by Cobalt Operating, LLC.

The RRC has issued 2 drilling permits between 1985 and 2014, permitted to 13,000 ft.

Operator of record

Cobalt Operating, LLC

Midland, TX · P-5 Y, filed Mar 2, 2018 · 8 permits on file · (432) 699-8903

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitCobalt Operating, LLCMay 9, 2014
13,000
total depth, ft
2
permits on file
May 9, 2014
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Jan 25, 2018

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
786542-99ReenterCobalt Operating, LLCMay 8, 2014May 9, 2014May 20, 201412,100
268127-99DrillNorth American Royalties, Inc.Feb 27, 1985Feb 28, 1985Mar 10, 198513,000

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Nov 2016
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000108490H-1 InjectionCanceled Jan 9, 201710,0005,37510,750–12,045

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120152016

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50132794, documented in the API reference.