WELL · 42-501-35203 · DISTRICT 8
Cleveland #4
Yoakum County · Platang (San Andres) field · Vertical
Cleveland #4 (API 42-501-35203) is a plugged well in Yoakum County, plugged July 14, 2023, last operated by Steward Energy II LLC.
The RRC has issued one drilling permit (amended once), issued May 17, 2005, permitted to 5,700 ft.
It was permitted by Pitco Investments, Ltd. and has since transferred to Steward Energy II LLC on the wellbore schedule.
Completion filings report one formation top, including San Andres.
Its lease has reported 16.8K barrels of oil since January 2006, last reporting in July 2023. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Pitco Investments, Ltd.; the EWA schedule now lists a different operator.
Fort Worth, TX · P-5 Y, filed May 4, 2026 · 200 permits on file · (855) 574-2995
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Steward Energy II LLC |
| Production reports | PPC Operating Company LLCthrough Oct 2013 |
| Latest permit | Pitco Investments, Ltd.May 17, 2005 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,700
- total depth, ft
- 2
- permits on file
- May 17, 2005
- last permit issued
- Feb 7, 2006
- completed
- 16.8K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2006 THROUGH Jul 2023
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 7, 2006
- Shut in
- —
- Plugged
- Jul 14, 2023
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Cleveland O-11-69077 | Platang (San Andres) | Steward Energy II, LLC | 2 | 16.8K | 0 | Jan 2006 – Jul 2023 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Pitco Investments, Ltd.Jan 2006 → Dec 2007
- 2BC Operating, Inc.Jan 2008 → Nov 2012
- 3PPC Operating Company LLCDec 2012 → Oct 2013
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 600714-98 | Drill | Pitco Investments, Ltd. | Mar 6, 2007 | May 17, 2005 | Aug 23, 2005 | 5,700 |
| 600714-99 | Drill | Pitco Investments, Ltd. | May 16, 2005 | May 17, 2005 | Aug 23, 2005 | 5,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-11-69077 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,710 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| San Andres | 5,189 | -1,479 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,274 | 5,405 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 398 | 12.25 | 210 S |
| 5.5 | 5,471 | 7.875 | 799 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 14, 2007 | Jan 8, 2007 | Yes |
| 00 | Apr 10, 2007 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-501-35203 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-501-35203 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- Nov 2006
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000086604 | H-1 Injection | Plugged Jul 24, 2023 | 1,000 | 2,500 | 5,500–5,750 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50135203, documented in the API reference.