WELL · 42-501-35636 · DISTRICT 8

West Brahaney Unit #116X

Plugged

Yoakum County · Brahaney field  · Vertical

West Brahaney Unit #116X (API 42-501-35636) is a plugged well in Yoakum County, plugged March 16, 2021, last operated by Burk Royalty CO. Ltd..

The RRC has issued one drilling permit, issued December 3, 2009, permitted to 5,500 ft.

It was permitted by Walsh Petroleum, Inc. and has since transferred to Burk Royalty CO. Ltd. on the wellbore schedule.

Completion filings report one formation top, including San Andres.

Its lease has reported 6.05M barrels of oil and 2.56M mcf of gas since January 1993, last reporting in July 2026. The lease carries 247 wells, so these are lease totals, not this well alone.

Operator of record

Burk Royalty Co. Ltd.

Permitted by Walsh Petroleum, Inc.; the EWA schedule now lists a different operator.

Wichita Falls, TX · P-5 Y, filed Nov 4, 2025 · 382 permits on file · (940) 232-5537

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBurk Royalty Co. Ltd.
Production reportsBurk Royalty Co., Ltd.through Apr 2026
Latest permitWalsh Petroleum, Inc.Dec 3, 2009

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,500
total depth, ft
1
permits on file
Dec 3, 2009
last permit issued
Mar 3, 2010
completed
6.05M
cumulative oil, bbl
2.56M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 3, 2010
Shut in
—
Plugged
Mar 16, 2021

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 247 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
West Brahaney Unit O-11-19640BrahaneyBurk Royalty Co., Ltd.2476.05M2.56MJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 94,163 · prior 12 100,738(-7%)

05K10K202420252026

Gas, mcf lease total

Last 12 months 42,192 · prior 12 13,732(+207%)

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Fina Oil & Chemical CompanyJan 1993 → May 1999
  2. 2First Permian, L.L.C.Jun 1999 → Nov 1999
  3. 3Walsh Petroleum, Inc.Dec 1999 → Sep 2021
  4. 4Burk Royalty Co., Ltd.Oct 2021 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
687954-99DrillWalsh Petroleum, Inc.Nov 25, 2009Dec 3, 2009Jan 11, 20105,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-19640————

Formation tops

As filed on W-2/G-1. Subsea from 3,692 ft elevation.Download CSV →

FormationMD ftSubsea
San Andres5,216-1,524

Perforations

Perforated and open-hole intervals.

FromToType
5,2165,263Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62539112.25300 S
4.55,2727.8751,500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 6, 2010Mar 16, 2010—
00Jul 8, 2010——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
305K
bbl, all reported
Nov 2020
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000090947H-1 InjectionPlugged Mar 29, 20216002,5505,150–5,400

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120192020

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50135636, documented in the API reference.