WELL · 42-501-36439 · DISTRICT 11

Cleveland A #2W

N

Yoakum County  · Vertical

Cleveland A #2W (API 42-501-36439) is a former disposal or injection well in Yoakum County, last operated by Pacesetter Energy, LLC; its UIC permit is no longer active.

The RRC has issued one drilling permit, issued July 11, 2014, permitted to 12,000 ft.

Operator of record

Pacesetter Energy, LLC

Flower Mound, TX · P-5 Y, filed Feb 7, 2020 · 47 permits on file · (972) 816-8023

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitPacesetter Energy, LLCJul 11, 2014
12,000
total depth, ft
1
permits on file
Jul 11, 2014
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
789259-99DrillPacesetter Energy, LLCJun 11, 2014Jul 11, 2014—12,000

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Nov 2015
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000110872H-1 InjectionCanceled Oct 31, 201620,0003,2506,500–10,000

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120142015

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50136439, documented in the API reference.