WELL · 42-503-02929 · DISTRICT 9
Bagley Estate Acct. #2 #5
Young County · Garvey (Strawn 3200) field · Vertical
Bagley Estate Acct. #2 #5 (API 42-503-02929) is a plugged well in Young County, plugged April 5, 1974, last operated by Littlepage & Gough.
The RRC has issued one drilling permit, issued January 5, 2009, permitted to 4,000 ft.
It was permitted by Three P Operating CO.,GP, L.L.C. and has since transferred to Littlepage & Gough on the wellbore schedule.
Completion filings report 2 formation tops, including Gunsight, Strawn.
Its lease has reported 17.8K barrels of oil and 21 mcf of gas since January 1993, last reporting in July 2026. The lease carries 5 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Three P Operating Co.,gp, L.L.C.; the EWA schedule now lists a different operator.
Graham, TX · P-5 Y, filed May 15, 1987 · 1 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Littlepage & Gough |
| Production reports | Ram Oil and Gas, Inc.through Jun 2025 |
| Latest permit | Three P Operating Co.,gp, L.L.C.Jan 5, 2009 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,000
- total depth, ft
- 1
- permits on file
- Jan 5, 2009
- last permit issued
- —
- completed
- 17.8K
- cumulative oil, bbl
- 21
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Apr 5, 1974
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Bagley Estate O-13-20406 | Young County Regular | Ram Oil and Gas, Inc. | 5 | 17.8K | 21 | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 2 · prior 12 84(-98%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Stephenson & PorterJan 1993 → Mar 1994
- 2JKW Energy DivisionJul 1994 → Nov 1994
- 3Three P Operating CompanyDec 1994 → Nov 2007
- 4Three P Operating Co.,gp, L.L.C.Dec 2007 → Aug 2024
- 5Ram Oil and Gas, Inc.Sep 2024 → Jun 2025
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 676063-99 | Reenter | Three P Operating Co.,gp, L.L.C. | Dec 9, 2008 | Jan 5, 2009 | Aug 13, 2009 | 4,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-20406 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,244 | 3,246 | Perforated |
| 3,260 | 3,266 | Perforated |
| 3,278 | 3,290 | Perforated |
| — | 3,276 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 176 | — | — |
| 5.5 | 2,590 | 7.875 | 100 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 2, 2014 | Sep 18, 2014 | Yes |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-503-02929 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-503-02929 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50302929, documented in the API reference.