WELL · 42-503-31032 · DISTRICT 9

Choate C. S. #1

Y

Young County · Young County Regular field · Injection  · Vertical

Choate C. S. #1 (API 42-503-31032) is a well in Young County operated by Horseshoe Production LLC, completed April 3, 1993 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued September 16, 1992, permitted to 3,267 ft.

It was permitted by Hill, R.M. Operating Inc. and has since transferred to Horseshoe Production LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Palo Pinto, Capps Lime, Buttram Sand.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 12.6K barrels injected in the 12 months reported through November 2025.

Operator of record

Horseshoe Production LLC

Permitted by Hill, R.M. Operating Inc.; the EWA schedule now lists a different operator.

Bryson, TX · P-5 Y, filed Sep 4, 2025 · (940) 550-5244

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHorseshoe Production LLC
Production reportsnone
Latest permitHill, R.M. Operating Inc.Sep 16, 1992

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,267
total depth, ft
1
permits on file
Sep 16, 1992
last permit issued
Apr 3, 1993
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 3, 1993
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Choate, C. S. O-13-17465Young County RegularHorseshoe Production, LLC100Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
403423-99RecompletionHill, R.M. Operating Inc.Sep 14, 1992Sep 16, 1992Apr 1, 19933,267

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-17465————

Formation tops

As filed on W-2/G-1. Subsea from 1,041 ft elevation.Download CSV →

FormationMD ftSubsea
Palo PintoPALO PINTO LM1,186-145
Palo PintoPALO PINTO LIME1,215-174
Capps Lime1,742-701
Buttram Sand2,125-1,084

Perforations

Perforated and open-hole intervals.

FromToType
2,029—Perforated
2,0962,118Perforated
2,1002,110Perforated
2,218—Perforated
—3,126Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62520112.25140 S
4.52,0297.875150 S
4.53,2677.875170 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 9, 2022Jan 13, 2022—
00May 6, 1993Apr 23, 1993Yes
00Jan 12, 1984Jan 14, 1975—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

12.6K
bbl, last 12 reported months
909K
bbl, all reported
Nov 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000077720W-14 DisposalActive2501,0002,096–2,118

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 12,566 · prior 12 11,518(+9%)

05001K1.5K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50331032, documented in the API reference.