WELL · 42-503-32544 · DISTRICT 9

Graham Est. -A- #4

Plugged

Young County · Sweeney (Conglomerate) field  · Vertical

Graham Est. -A- #4 (API 42-503-32544) is a plugged well in Young County, plugged January 28, 1998, last operated by Bulwark Oil & Gas LLC.

The RRC has issued one drilling permit, issued October 24, 1977, permitted to 4,350 ft.

It was permitted by Antle, E. and has since transferred to Bulwark Oil & Gas LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Palo Pinto, Capps Lime, Capps Lime`, Caddo.

Its lease has reported 2.5K barrels of oil and 11.3K mcf of gas since January 1993, last reporting in September 2024. The lease carries 4 wells, so these are lease totals, not this well alone.

Operator of record

Bulwark Oil & Gas LLC

Permitted by Antle, E.; the EWA schedule now lists a different operator.

Graham, TX · P-5 Y, filed Dec 4, 2025 · (940) 456-1223

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBulwark Oil & Gas LLC
Production reportsAntle Operating, Inc.through Dec 1997
Latest permitAntle, E.Oct 24, 1977

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,350
total depth, ft
1
permits on file
Oct 24, 1977
last permit issued
Feb 7, 1992
completed
2.5K
cumulative oil, bbl
11.3K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 2024

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 7, 1992
Shut in
—
Plugged
Jan 28, 1998

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Graham Est. -A- O-13-18070Sweeney (Conglomerate)Bulwark Oil & Gas, LLC42.5K11.3KJan 1993 – Sep 2024

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Antle, E.Jan 1993 → Jun 1994
  2. 2Antle Operating, Inc.Jul 1994 → Nov 1997

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
10511-99DrillAntle, E.Oct 24, 1977Oct 24, 1977—4,350

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-18070————

Formation tops

As filed on W-2/G-1. Subsea from 1,201 ft elevation.Download CSV →

FormationMD ftSubsea
Palo PintoPALO PINTO LIME1,865-664
Palo PintoPALO PINTO LM1,865-664
Capps Lime2,352-1,151
Capps Lime`2,352-1,151
CaddoCADDO LIME3,747-2,546
Marble FallsMARBLE FALLS LIME4,320-3,119

Perforations

Perforated and open-hole intervals.

FromToType
4,2604,266Perforated
—4,266Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251101160 S
4.54,3457.875110 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 12, 1994Nov 23, 1994—
00Feb 18, 1993Jan 22, 1993—
00Jun 1, 1989Apr 25, 1989—
00Jan 12, 1984Jan 27, 1978—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
65.4K
bbl, all reported
Oct 1994
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000069073H-1 InjectionPlugged Feb 11, 19982001,1004,260–4,266

MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS

Last 12 months 0

011994

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50332544, documented in the API reference.