WELL · 42-503-32615 · DISTRICT 9

Whitaker H. Etal #4

Plugged

Young County · Young County Regular field  · Vertical

Whitaker H. Etal #4 (API 42-503-32615) is a plugged well in Young County, plugged March 7, 2023, last operated by Stewart Construction.

The RRC has issued one drilling permit, issued December 22, 1977, permitted to 750 ft.

It was permitted by Davis, Robert E. and has since transferred to Stewart Construction on the wellbore schedule.

Completion filings report one formation top, including Gunsight.

Its lease has reported 4.77K barrels of oil and 500 mcf of gas since January 1993, last reporting in July 2026. The lease carries 4 wells, so these are lease totals, not this well alone.

Operator of record

Stewart Construction

Permitted by Davis, Robert E.; the EWA schedule now lists a different operator.

Graham, TX · P-5 Y, filed Mar 4, 2026 · 2 permits on file · (940) 438-2538

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleStewart Construction
Production reportsStewart Constructionthrough Apr 2026
Latest permitDavis, Robert E.Dec 22, 1977

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

750
total depth, ft
1
permits on file
Dec 22, 1977
last permit issued
Nov 15, 1997
completed
4.77K
cumulative oil, bbl
500
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 15, 1997
Shut in
—
Plugged
Mar 7, 2023

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Whitaker, H. Etal O-13-18206Young County RegularStewart Construction44.77K500Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 40 · prior 12 138(-71%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Smith, E. J.Jan 1993 → May 1994
  2. 2Boydston & MooreJun 1994 → Jul 2002
  3. 3Bluebonnet Land & Cattle Co.Jan 2005 → Jun 2025
  4. 4Stewart ConstructionAug 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
14523-99DrillDavis, Robert E.Dec 22, 1977Dec 22, 1977—750

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-18206————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Gunsight730
Gunsight740

Perforations

Perforated and open-hole intervals.

FromToType
735742Perforated
743747Perforated
—742Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.57356.2588 S
4.57356.588 S
4.57396.7580 S
4.57397.87585 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 13, 1998Nov 24, 1997—
00Feb 6, 1998Nov 24, 1997—
00Jul 20, 1990Mar 5, 1990—
00Jan 12, 1984Dec 4, 1978—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
46.9K
bbl, all reported
Nov 1997
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000069404H-1 InjectionPlugged Mar 13, 202320400743–747

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0119961997

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50332615, documented in the API reference.