WELL · 42-503-33468 · DISTRICT 9

Strother-Nix #1

N

Young County  · Vertical

Strother-Nix #1 (API 42-503-33468) is a former disposal or injection well in Young County, last operated by Britton Operating, Inc; its UIC permit is no longer active.

The RRC has issued 3 drilling permits (amended twice) between 1979 and 1985, permitted to 4,999 ft.

Completion filings report 2 formation tops, including Palo Pinto, Caddo.

Its 2 leases have reported 29.1K barrels of oil and 20 mcf of gas since January 1993, last reporting in March 2008. The leases carry 6 wells, so these are lease totals, not this well alone.

Operator of record

Britton Operating, Inc

Aledo, TX · P-5 Y, filed Nov 2, 2018 · 146 permits on file · (817) 793-3227

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsNix, Tommythrough Apr 2005
Latest permitBritton Operating, IncSep 13, 1985
4,999
total depth, ft
5
permits on file
Sep 13, 1985
last permit issued
—
completed
29.1K
cumulative oil, bbl
20
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2008

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 6 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Strother O-13-19228Young County RegularNix, Tommy329.1K20Jan 1993 – Mar 2008
Strother-Nix O-13-25785Young County RegularNix, Tommy3110Jan 1993 – Jun 1998

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Nix, TommyJan 1993 → Apr 2005

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
284968-99OtherBritton Operating, IncSep 12, 1985Sep 13, 1985—4,700
176025-99OtherNix, TommyOct 29, 1982Oct 29, 1982—4,999
58850-97DrillBritton Operating, IncJan 15, 1986Sep 25, 1979Sep 20, 19854,700
58850-98DrillNix, TommyOct 29, 1982Sep 25, 1979—4,999
58850-99DrillBruce Operating AccountSep 25, 1979Sep 25, 1979—3,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-19228————
—— O-13-25785————
—— O-13-25785————

Formation tops

As filed on W-2/G-1. Subsea from 1,113 ft elevation.Download CSV →

FormationMD ftSubsea
Palo PintoPALO PINTO LIME1,406-293
Caddo3,050-1,937

Perforations

Perforated and open-hole intervals.

FromToType
2,9442,950Perforated
3,0503,060Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62522512.25175 S
8.62525012.25175 S
4.53,1507.875100 S
4.54,6707.875125 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 27, 1997Mar 15, 1993—
00Sep 8, 1994Mar 15, 1993—
00Mar 15, 1994Feb 14, 1994—
00Mar 8, 1994Oct 7, 1985Yes
00Jan 24, 1986Oct 7, 1985Yes
00Dec 12, 1985Oct 7, 1985—
00Dec 4, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

3.15K
bbl, last 12 reported months
77.7K
bbl, all reported
Nov 2000
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000066785W-14 DisposalPlugged Mar 2, 20014003003,050–3,060

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 3,148 · prior 12 12,933(-76%)

05001K1.5K19992000

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50333468, documented in the API reference.