WELL · 42-503-34303 · DISTRICT 9

Henley-Ford #2

Plugged

Young County · Young County Regular field  · Vertical

Henley-Ford #2 (API 42-503-34303) is a plugged well in Young County, plugged September 17, 1992, last operated by R.J. Riley Operating LLC.

The RRC has issued one drilling permit, issued October 20, 1980, permitted to 2,700 ft.

It was permitted by Weatherbee, Robert Pete and has since transferred to R.J. Riley Operating LLC on the wellbore schedule.

Completion filings report one formation top, including Mccluskeysand.

Its lease has reported 20.1K barrels of oil and 6.81K mcf of gas since January 1993, last reporting in July 2026. The lease carries 6 wells, so these are lease totals, not this well alone.

Operator of record

R.J. Riley Operating LLC

Permitted by Weatherbee, Robert Pete; the EWA schedule now lists a different operator.

Graham, TX · P-5 Y, filed Jan 5, 2026 · 1 permits on file · (940) 550-2226

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleR.J. Riley Operating LLC
Production reportsR.J. Riley Operating, LLCthrough Apr 2026
Latest permitWeatherbee, Robert PeteOct 20, 1980

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,700
total depth, ft
1
permits on file
Oct 20, 1980
last permit issued
Apr 27, 1987
completed
20.1K
cumulative oil, bbl
6.81K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 27, 1987
Shut in
—
Plugged
Sep 17, 1992

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 6 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Henley-Ford O-13-20619Young County RegularR.J. Riley Operating, LLC620.1K6.81KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 250 · prior 12 76(+229%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Double L OperatingJan 1993 → Aug 2011
  2. 2R.J. Riley Operating, LLCSep 2013 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
96154-99DrillWeatherbee, Robert PeteOct 20, 1980Oct 20, 1980Nov 30, 19802,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-20619————

Formation tops

As filed on W-2/G-1. Subsea from 1,036 ft elevation.Download CSV →

FormationMD ftSubsea
McCluskeysand1,910-874

Perforations

Perforated and open-hole intervals.

FromToType
2,1102,124Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62513011.2575 S
8.62513012.25100 S
2.3752,114——
4.52,1607.875100 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 26, 1988Feb 4, 1988—
00Jan 12, 1984May 14, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

4.13K
bbl, last 12 reported months
65.6K
bbl, all reported
Oct 1992
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000062783H-1 InjectionPlugged Oct 6, 1992608001,898–1,956

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 4,130 · prior 12 30,640(-87%)

01K2K3K19911992

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50334303, documented in the API reference.