WELL · 42-503-35689 · DISTRICT 9

Harrison #1

N

Young County  · Vertical

Harrison #1 (API 42-503-35689) is a permitted well in Young County filed by Wes-Mor Drilling, Inc.; no completion report is on file yet.

The RRC has issued 3 drilling permits in 1982, permitted to 4,990 ft.

Operator of record

Wes-Mor Drilling, Inc.

Graham, TX · P-5 Y, filed Sep 4, 2025 · 304 permits on file · (940) 549-5515

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsWes-Mor Drilling, Inc.through Sep 1996
Latest permitWes-Mor Drilling, Inc.Dec 13, 1982
4,990
total depth, ft
3
permits on file
Dec 13, 1982
last permit issued
—
completed
0
cumulative oil, bbl
15K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 1997

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Harrison G-13-107604James, South (Caddo)Wes-Mor Drilling, Inc.1015KJan 1993 – Oct 1997

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Wes-Mor Drilling, Inc.Jan 1993 → Sep 1996

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
179888-99RecompletionWes-Mor Drilling, Inc.Dec 13, 1982Dec 13, 1982—4,815
171578-99RecompletionWes-Mor Drilling, Inc.Sep 10, 1982Sep 10, 1982—4,815
148223-99DrillWes-Mor Drilling, Inc.Jan 20, 1982Jan 20, 1982—4,990

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-13-107604————

Perforations

Perforated and open-hole intervals.

FromToType
3,8183,825Perforated
4,3014,308Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62526112.25200 S
2.3753,810——
2.3754,273——
4.54,4637.875250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 8, 1986Oct 31, 1983—
00Jan 12, 1984Sep 17, 1982—
00Jan 12, 1984Mar 31, 1982—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50335689, documented in the API reference.